说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 核电厂二回路系统
1.
Research on Application of Kalina-Cycle in Second-Loop System of Nuclear Power Plants
卡利纳循环在核电厂二回路系统的应用探讨
2.
A Matrix Analytic Method for the Second Loop Thermodynamic System of a Pressurized Water Reactor-based Nuclear Power Plant
压水堆核电机组二回路热力系统矩阵分析法
3.
The Study of Secondary Water Chemistry Problem for Qinshan Ⅱ NPP;
秦山第二核电厂二回路水质问题及对策研究
4.
Research on unified models of heat-economic analysis for PWR nuclear power plants
压水堆核电机组二回路热力系统热经济性分析统一模型的研究
5.
Simulation on Steam System of the Secondary Loop of Nuclear-Powered Plant;
核动力装置二回路蒸汽系统仿真研究
6.
STUDY ON COMPUTATIONAL MODELS OF SECONDARY SOURCE TERMS FOR NORMAL OPERATION OF CPR1000 NUCLEAR POWER PLANTS
CPR1000核电机组二回路系统稳态运行期间的放射性源项计算
7.
Research on the Unified Physical Model and the Mathematic Model of Heat-economic Analysis for PWR Nuclear Power Plant
压水堆核电机组二回路热力系统热经济性分析统一物理模型和数学模型
8.
A New Technology of Nuclear Emergency Electronic Accountibility System
秦山第三核电厂核应急电子清点系统
9.
Basic dimensions of electrical console for secondary circuit of power system
GB/T7266-1987电力系统二次回路电气控制台基本尺寸
10.
Enlargement Upgrading and Reform of Qinshan Nuclear Power Plant Ⅱ Computer Network Monitoring System
秦山第二核电厂计算机网络监控系统的扩充、升级和改造
11.
Technology development tendency and R&D idea of NPP radiation monitoring system
核电厂辐射监测系统技术发展趋势及产品研发思路
12.
Criteria for safety class power systems for nuclear power plants
GB/T12788-1991核电厂安全级电力系统准则
13.
Study on Accident Progress of Primary System During Mid-loop Operation in Nuclear Power Plant
核电厂“半环”运行工况一回路事故进程研究
14.
Optimization of Leakage Calculation in RCP System of PWR
压水堆核电厂一回路冷却剂泄漏率计算的优化
15.
Issues Existing in Power Plant Secondary Circuit and its Treatment Solution
发电厂二次回路中存在的问题及解决方法
16.
Common fault analysis on construction quality of BOP workshop fire water system in nuclear power plant
核电厂BOP厂房消防水系统施工质量通病分析
17.
Criteria for safety systems for nuclear power plants
GB13284-1998核电厂安全系统准则
18.
Application of Nuclear Safety Principle for Reactor Protection System in QinShan Phase II NPP Extension Project
秦山核电厂二期扩建工程反应堆保护系统设计中核安全原则的应用