说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 一期工程受水区
1.
Eco-hydrological regionalization for water receiving areas of Phase Ⅰ Project of Mid-route of South-to-North Water Transfer Project
南水北调中线一期工程受水区生态水文分区
2.
ON THE FIRST STAGE OF EAST AND MIDDLE ROUTES OF SOUTH-TO-NORTH WATER TRANSFER PROJECT AND WATER PRICE POLICY IN THE WATER-RECEIVING AREAS
南水北调东中线一期工程及受水区水价政策探讨
3.
Ecological and Environmental Impact Analysis of First Phase of South-to-North Water Transfer Project on Water-recipient Areas
南水北调东、中线一期工程对受水区生态环境影响分析
4.
Demonstration of the Mid-and-long-term Urban Water Transfer Project in Yuncheng City
运城市中远期城区供水水源工程论证
5.
Natural Eco-environment Comprehensive Assessment by Remote Sensing Technology in West Route Area of South-West Line Project
南水北调西线一期工程调水区生态环境质量遥感分析与综合评价
6.
Water Resources Optimal Allocation of the Water Imported Areas in the South-to-North Water Transfer Project;
南水北调工程受水区资源优化配置研究
7.
The South to North Water Transfer Project and the Transition of Social and Economic System in its Flowing Areas;
南水北调工程与受水区经济社会制度变迁分析
8.
Impacts on river ecosystem of the dry river valley in the first stage of western line of South-to-North Water Transfer Scheme
南水北调西线一期工程对干旱河谷区河流生态系统影响初探
9.
Water Pricing Research on the First Stage Project of the Western Route of the South-To-North Water Transfer;
南水北调西线一期工程水价初步研究
10.
Design of Water Supply and Sewerage System in Luojing Terminal(Phase 2) of Shanghai Port
上海港罗泾港区二期工程给水排水设计
11.
Study on the Agricultural Water Price of South-to-North Water Transfer East Route Project in Jiangsu Reception Basin;
南水北调东线工程江苏受水区农业供水价格研究
12.
Water Resources Optimal Allocation of the Water Imported Areas in the Hanjiang-To-Weihe River Water Transfer Project;
陕西省引汉济渭调水工程受水区水资源优化配置研究
13.
The Operation Mode of the Regulating Reservoirs in Intake Areas of the Middle Route of the South-to-North Water Transfer Project
南水北调中线工程受水区调蓄水库运行方式研究
14.
Space Syntax Study of First Phase Construction Project in New Xuzhou City
徐州新城区一期工程的空间句法研究
15.
Change of re-siltation in the Yangtze Estuary deepwater channel during 1~(st) and 2~(nd) stages
长江口深水航道(一、二期工程)回淤变化
16.
Construction of the Yangshan Deepwater Seaport( Phase1), including the port area, Donghai Bridge and the New Harbor City, progressed rapidly as scheduled.
洋山深水港区一期工程加快推进,港区,东海大桥和临港新城建设完成了节点目标。
17.
the permanent shiplock construction in the first stage includes its excavation in the first stage,drainage works of the high slope in the first stage,construction adit of the water conveyance system.
一期工程包括一期开挖、高边坡山体排水一期工程和输水系统施工支洞三大标块。
18.
Design summarization about water supply and drainage for Nansha Container Terminal Phase Ⅱ Project of Guangzhou Port
广州港南沙港区二期工程给排水设计总结