说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三板溪主坝
1.
Analysis on stress and strain before and after the face-slab damage of Sanbanxi dam
三板溪主坝面板破损前后应变应力分析
2.
Analysis on the seepage monitoring data of Sanbanxi face-slab rock-fill dam
三板溪面板堆石坝渗流监测资料分析
3.
Analysis on cause reason for face-slab damage of Sanbanxi face-slab rock-fill dam
三板溪混凝土面板坝面板破损原因分析
4.
Study on Construction Dynamic Visual Simulation and Optimization for Sanbanxi Concrete Facing Rockfill Dam;
三板溪面板堆石坝施工动态可视化仿真与优化研究
5.
Damage cause and rehabilitation of the face slab of Sanbanxi high rock fill dam
三板溪堆石高坝面板局部受损成因初析及修复施工简介
6.
Construction Characteristics of Safety Monitoring System of Sanbanxi Hydroelectric Station and Suggestions for Its Operation
三板溪水电站大坝安全监测系统建设特点及运行建议
7.
3 Dimensional Non-linear Finite Element Analysis for Xiluodu High Arch Dam Abutment Stability
溪洛渡高拱坝坝肩(基)稳定性的三维非线性有限元分析
8.
Three-Dimensional Nonlinear Finite Element Analysis of Dam Structure and Abutment s Stability in Xiluodu;
溪洛渡高拱坝结构特性及坝肩稳定性三维非线性有限元分析
9.
On the tourism development in Sanbanxi reservoir area in Jinping;
锦屏县三板溪库区旅游开发措施探讨
10.
Research on application of PS boards in TGP dam temperature insulation
聚苯乙烯板在三峡大坝坝体保温中的应用
11.
CFRD Material Zoning Optimization and 3-D FEM Analysis on Dam Deformation Character;
混凝土面板堆石坝坝料分区优化及坝体变形特性三维有限元分析
12.
3D Finite element analysis of complex prevented-seepage face rockfill dam;
复合防渗面板堆石坝三维有限元分析
13.
Mechanized construction technology considerations for the asphaltic concrete core wall of Maopingxi protective rockfill dam for Three Gorges Project
三峡茅坪溪防护土石坝沥青混凝土心墙机械化施工技术研究
14.
Numerical study on Maopingxi Rockfill Dam with asphalt concrete core in Three Gorges Project
三峡茅坪溪沥青混凝土心墙堆石坝应力变形分析
15.
Research on Mechanical Behavior of Asphalt-concrete and Safety Analysis to Maopingxi Rockfill Dam in TGP;
沥青混凝土防渗体的力学特性研究与三峡茅坪溪土石坝安全分析
16.
The Analysis and Prediction of Stress and Deformation in Maopingxi Dam of The Three Gorges Project;
三峡水利枢纽茅坪溪防护大坝应力与变形的分析和预测
17.
Comparison of Flow Fields of the Arch Inverted Plunge Cushion Pool with the Flat-bottomed Cushion Pool of Xiluodo Arch Dam by Using 3-D Numerical Simulation
溪洛渡高拱坝反拱水垫塘与平底水垫塘流场的三维数值模拟比较
18.
Optimization of flood limited water level of the Three Gorges Project in flood period under the influence of Xiangjiaba and Xiluodu projects
向家坝、溪洛渡建库后三峡水库汛限水位优化研究