说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 时延修正
1.
NUMERICAL ANALYZING OF SEVERAL TYPICAL CORRECT MODELOF TROPOSPHERE ADDITIONAL TIME DELAY;
几个典型的对流层电波传播附加时延修正模型的数值分析
2.
Accurating and Delay Correction Analysis of Pulsar Timing Model
脉冲星时间模型精化及延迟修正分析
3.
Modified bias-free adaptive time delay estimation with lower SNR using γ-LMS algorithm
低信噪比环境下基于γ-LMS算法的修正无偏自适应时延估计方法
4.
correction for radio wave propagation of time signal
电磁传播[时延] 改正
5.
Frequency estimation of modified MUSIC algorithm based on multi-path delay structure
多路延迟结构的修正MUSIC算法频率估计
6.
These rates tend to be sticky rates -- it takes time for them to come down,'' said Ethan Kra, chief pension actuary at Mercer Human Resource Consulting in New York.
当然一位人力顾问也指出,这项比率本来就有递延性,就算要向下修正也要一段时间慢慢反映。
7.
Delay Time Model Based on Imperfect Maintenance
一种包含非理想维修的延迟时间模型
8.
To make an improvised modification.
作一次临时性的修正。
9.
The government introduced amendments to the draft extension bill
政府提出对延期偿还法令草案的修正案。
10.
Currently the path delay model consists in parameter estimation.
目前的路径延迟模型是参数估计及外部修正法。
11.
They are stalling for time.
他们在避免正面答复以拖延时间。
12.
The Delay-time-based Inspection Models and Their Comparison;
基于时间延迟维修理论检查模型的比较研究
13.
Some Thoughts of the Reform of Ideological and Ethical Attainments Course Teaching: An Approach to the Extension of the Time and Space and the Effectiveness of Education;
《思想道德修养》课延扩时空教育实效之路的探索
14.
Products repaired shall be warranted for the longer of three(3) months or the balance of the original product warranty whichever is shorter.
在保修期内维修过的产品其保修期应延长3个月或距离原产品保修期限余剩的时间.
15.
Some say it is inferred in Articles Nine and Ten, others say if it's not listed it is not a right.
有人说第九,第十修正案的延伸,有人说,该权利未列出就不是权利。
16.
When a regular workday is ten hours the overtime work may not exceed two hours for that particular day.
二当日正常工时达十小时者,其延长之工作时间不得超过二小时。
17.
In the process of modifing weights, the paper introduces the way of series.
在修改权值时,引入串行修正权值的思想。
18.
Two examples are buy- ing excess inventory when purchase prices are below standard and postponing needed maintenance on equipment.
例如,采购价格低于标准时,存货过多;成本降低时,设备被延迟修理。