说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 海底隧道工程
1.
Ways,Characteristics and Prevention of Pollutions from Cross Harbour Tunnels to Marine Environment
海底隧道工程对海洋环境的污染方式、特点及防治
2.
Dynamic Construction Mechanics Analysis of Xiamen Sub-sea Tunnel in Terrestrial Shallow Section
厦门海底隧道陆域浅埋段动态施工过程分析
3.
an undersea cable [tunnel]
海底电缆 [隧道]
4.
hiring involving the use of the Western Harbour Crossing once
使用西区海底隧道单程过海
5.
Western Harbour Crossing
西区海底隧道〔西隧〕
6.
Study on key construction technologies of Xiamen Xiang'an subsea tunnel
厦门翔安海底隧道施工关键技术研究
7.
Key Construction Technology of the Submarine Tunnel of the Eastern Passageway in Xiamen;
厦门东通道海底隧道施工关键技术研究
8.
Stability analysis of Zhoushan subsea tunnel with drill-and-blast construction method
舟山灌门水道海底隧道钻爆法施工稳定性分析
9.
Application and Research on Excavation Method in Xiang'an Subsea Tunnel
施工工法在翔安海底隧道中的应用研究
10.
Construction Method of Weathered Trough Section in Xiang'an Undersea Tunnel of Xiamen
厦门翔安海底隧道中风化槽地段施工工法
11.
Eastern Harbour Crossing Company Limited
东区海底隧道有限公司
12.
Eastern Harbour Crossing road tunnel area
东区海底隧道行车隧道区
13.
Risk Control of the Construction of Xiamen Tunnel Through Regolith Sections;
厦门海底隧道穿越风化槽段施工的风险控制
14.
Risk Evaluation and Research for Representative Construction Risk of a Sub-Sea Tunnel Below the Jiaozhouwan;
胶州湾海底隧道典型施工风险评估与研究
15.
The Study on Blasting Vibration of Xiamen Undersea Tunnel Constructed by Drilling and Blasting Method
厦门海底隧道钻爆施工爆破振动规律研究
16.
Study on waterproof and drainage technology of drilling and blast subsea tunnel
钻爆法施工的海底隧道结构防排水技术研究
17.
Key tunneling technology and configuring big machines in Qingdao Jiaozhouwan subsea tunnel
青岛胶州湾海底隧道施工及机械配套技术
18.
Study on construction technique of large section sub-sea tunnel crossing the weak stratum
大断面海底隧道软弱地层施工方法研究