说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙口水利枢纽工程
1.
Temperature Control on Concrete Pouring of Longkou Water Control Project
龙口水利枢纽工程混凝土浇筑温度控制
2.
Research on Repair of Concrete Surface for Longkou Hydro-junction Project of Yellow River
黄河龙口水利枢纽工程混凝土表面缺陷修复研究
3.
Evaluation on regional tectonic stability of Danjiangkou Hydro-junction
丹江口水利枢纽工程区域构造稳定性分析
4.
Technology and Measures on Mixed Sand Processing of Tingzikou Water Control Project
亭子口水利枢纽混合砂加工工艺措施
5.
Analysis of the Operating Behavior of Concrete Dam of the Danjiangkou Hydro-junction
丹江口水利枢纽砼大坝工作性态分析
6.
The Necessary and Urgency for Developing and Constructing the Longkou Water Control Project on Yellow River;
开发建设黄河龙口水利枢纽的必要性和紧迫性
7.
Study of navigation flow condition for Xiafu Hydraulic Complex
下福水利枢纽工程通航水流条件研究
8.
Organization of completion documents of Xiafu Hydraulic Complex
浅谈下福水利枢纽工程竣工资料整理
9.
Design and Construction of Cofferdam for Diversion Channel at Tingzikou Water Conservancy and Hydropower Project
亭子口水利枢纽工程导流明渠围堰的设计与施工
10.
Review on Comprehensive Treatment of Dayuanbao Landslide in Tingzikou Water Control Project
亭子口水利枢纽工程大园包崩滑体综合治理施工综述
11.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
12.
Construction Supervision System During Yellow River Wanjiazhai Water Control Project;
黄河万家寨水利枢纽工程的建设监理
13.
Management of Electro-mechanical items for Xiafu Hydraulic Complex during construction period
下福水利枢纽工程建设机电项目管理
14.
A Crucial Project for Harnessing the Yellow River:Xiaolangdi Multi-purpose Dam Project
治理黄河的关键工程——小浪底水利枢纽
15.
Experimental Study on Flood Energy Dissipation and Erosion Control of Zuan'gen Water Control Project
钻根水利枢纽工程消能防冲试验研究
16.
Evaluation for the engineering geological conditions of concrete dam in Hadashan water project
哈达山水利枢纽工程枢纽区砼坝段工程地质条件及评价
17.
The technique of high slope shot Crete support application in diversion tunnel on the Heihe River
黑河水利枢纽工程导流洞出口高边坡喷锚支护技术
18.
Research on the Calculational Method of the Production Population’s Allocation for the Lechang Gorge Irrigation Works Hinge in Guangdong Province
乐昌峡水利枢纽工程生产安置人口计算方法探讨