说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 改进的分水岭
1.
Application of an Improved Watershed Segmentation Algorithm in Weld Detection;
改进的分水岭分割算法在焊接检测中的应用
2.
Application of Improved Watershed Algorithm in Image of Device Wall Segmentation
改进的分水岭算法在设备内壁图像分割中的应用
3.
Color image segmentation based on improved watershed transform
改进分水岭算法的彩色图像分割技术
4.
Color Image Segmentation based on Improved Watershed Algorithm
基于改进分水岭算法的彩色图像分割
5.
Application of the Improved Watered Arithmetic at Image Segmentation;
改进后的分水岭算法在图像分割中的应用研究
6.
Segmentation of Remote Sensing Imagery Based on Improved Watershed Algorithm
基于改进分水岭变换的遥感图像分割方法
7.
Stereoscopic video object segmentation based on improved watershed algorithm
基于改进分水岭算法的立体视频对象分割
8.
Silicon Defect Extraction Method Based on Improved Watershed Algorithm
基于改进分水岭算法的硅片缺陷提取方法
9.
An Improvement of Combining Generalized Ridge and Principal Components Estimator for Seemingly Unrelated Regression System
半相依回归系统的广义岭型主成分改进估计
10.
ill-defined divide
表现不明显的分水岭
11.
The Control and Improvement of FAC in LingAo II Feedwater Pipe Work
岭澳核电站二期给水管道流动加速腐蚀的控制与改进
12.
The factors influencing the viscosity property of kaolin pigment were introduced, followed by the modification methods, such as mechanical process, treatment with dispersant, etc.
介绍了高岭土的黏度改进加工方法,如机械加工,分散剂处理等。
13.
Technical Improvement of ATE System of Ling’ao Nuclear Power Plant PhaseⅡ
岭澳核电站二期凝结水处理系统重大技术改进
14.
Research on improvement of ridge estimate of coefficients in the multiple linear model
多元线性模型系数岭估计的改进研究
15.
Experimental Study on Treatment of Oily Wastewater by Modifi ed Kaolin
改性高岭土处理含油废水的实验研究
16.
A NEW ADVANCE OF THE RESEARCH ON MARINE DEVONIAN STRATIGRAPHY IN THE NORTH PART OF THE WEST QINLING MOUNTAINS OF GANSU AND THE REDIVI-SION OF THE XIHANSHUI GROUP
甘肃西秦岭北部海相泥盆系研究新进展及西汉水群的再分
17.
Image Segmentation Based on Watershed Transform and FCM
基于分水岭变换和FCM的图像分割
18.
Improved Mean-shift Segmentation Algorithm Combined with Watershed Method
结合分水岭的Mean-Shift图像分割新算法