说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三台阶核心土环形开挖法
1.
Three-bench Ring-like Excavation for Core Soil in the Construction of Guangyi Tunnel
三台阶核心土环形开挖法在广以隧道中的应用
2.
Three-bench Seven-step Excavation Method for Large Section Loess Tunnel
浅谈大断面黄土隧道三台阶七步开挖法
3.
Stress analysis with reservation core soil of annular excavation on wall rock in sandstone section of hydraulic tunnel
水工隧洞砂岩段围岩环形开挖预留核心土法受力分析
4.
Analysis of Annular Pit with Core Rock Support Method Adopted in Large-scale Tunnel Construction
留核心土环形开挖工法在隧道设计施工中的应用
5.
Three-bench Seven-step Excavation of Lishi Tunnel
三台阶七步开挖法在离石隧道施工中的应用
6.
Analysis of longitudinal deformation profile in city-gate shaped tunnel using top heading and bench excavation method
上下台阶开挖下城门形隧洞纵向变形规律分析
7.
Three-Dimensional Numerical Simulation Study on the Soil Distortion of Shield Tunneling in Loess Area;
黄土盾构隧道开挖土体变形的三维数值模拟
8.
The cross section of Beijing Yingshan Mountain tunnel is superlarge scale supershallow overburden,by using of positive step are guiding adit excavation on method are both satisfactory in effect and cost.
北京鹰山隧道断面特大,埋深特浅,采用正台阶弧形导坑施工法开挖,效率及成本均优。
9.
The Study of Field Measurements of Short Step and Seven-step-excavation in a Tunnel of Mild Clay Stratum
亚黏土地层隧道台阶七步开挖施工现场测试研究
10.
Safety Assessment of Circular Arches Tunnel Evacuation on Surrounding Geotechnical Environment
圆拱形断面隧道开挖对周围岩土环境安全评价
11.
Excavation Displacement Analysis by Distinct Element Method in Three Gorges Project;
三峡永久船闸高边坡开挖变形的离散元法分析
12.
A Three-step Closed-loop Identification Method Based on Step Response and Open Loop Transformation
基于阶跃响应和开闭环转换的三步法辨识
13.
RESPONSE ANALYSIS OF SHIELD TUNNELLING-INDUCED LAYERED SOIL DEFORMATION BASED ON DEFORMATION CONTROLLED BOUNDARY ELEMENT METHOD
基于位移控制边界单元法盾构隧道开挖引起分层土体变形分析
14.
INFLUENCE ON SURROUNDING ENVIRONMENT OF DEEP EXCAVATION OF DIFFERENT GRADIENT SLOPE APPLYING THE CONSTRUCTION OF CENTRAL ISLAND WITH INCLINED BRACE
“中心岛法”斜支撑基坑开挖坡比对周边环境的影响
15.
Research on Rolling Technology of Conical Ring with Inner Steps and Ring Rolling Mill;
内台阶锥形环件轧制工艺与设备研究
16.
Manual Excavated Continuous Concrete Wall of the Arch Bridge Abutment Foundation in the Loess Region
黄土地区拱桥桥台人工开挖地下连续墙基础
17.
A New Paradigm of New Product Development Management: Core Competence-based Platform Approach;
新产品开发管理新范式:基于核心能力的平台方法
18.
A Study of Constructing the Visualized Simulation Platform for Safe Coal Mining and Core Algorithm
煤矿安全开采可视化决策平台构建及核心算法研究