说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 石灰竖炉
1.
Development and Application of 500 m~3 Large Lime Shaft Furance
500m~3大型石灰竖炉的开发与应用
2.
This paper introduces the application of blast furnace gas on water-tube boiler, heating furnace, lime shaft kiln and coke oven.
介绍了韶钢高炉煤气在热电锅炉、加热炉、石灰竖窑、焦炉等工业炉窑上的应用情况。
3.
He turned, and flipped the ash from his cigarette on to the great marble hearth-stone that lay bare to the rim, without fender or bar.
他转身将烟灰弹入那硕大的大理石火炉里,火炉孤零零地竖在房间,没有围栏,也没有栏杆。
4.
The Characteristics of Active Lime Prouduction Process Via Gas-burning Sleeve Kiln
气烧套筒石灰竖窑活性石灰生产过程
5.
Characteristic of Active Lime Prouduction Process Via Gas-Burning Sleeve Kiln
气烧套筒石灰竖窑生产活性石灰的工艺特点
6.
fluosolid lime calciner
沸腾式石灰渣焙烧炉
7.
Application and Practice of 300t/d Double Beam Lime Shaft Kiln
300t/d双梁式石灰竖窑的应用实践
8.
ANALYSIS ON CALCINING TECHNOLOGIES FOR POT CALCINER IN CHINA
中国竖罐式炉煅烧石油焦技术分析与研讨
9.
A study on shaft kiln to calcine dolomite with coke-oven gas
燃用焦炉煤气的竖窑煅烧白云石技术研究
10.
Study on Residual Heat Recovery of 200m~3 Lime Shaft Kiln in Lingsteel;
凌钢200m~3石灰竖窑余热回收系统的研究
11.
THE FEASIBLE STUDY OF EXTENSION OF GAS-BURNING LIMESTONE VERTICAL KILN IN WU HAI CITY AND ITS NEIGHBORING AREA;
论乌海及周边地区推广气烧石灰竖窑的可行性
12.
Process Modification Practice for Output Increase and Consumption Reduction at 150 m~3 Lime Kiln,Tiantie
天铁150m~3石灰竖窑增产、降耗工艺改造实践
13.
Application of Frequency Converter to Skip Hoist of Double "D" Lime Shaft Kiln
变频器在双“D”石灰竖窑卷扬提升机上的应用
14.
Iron ore, coke, and limestone are put into the top of the furnace. These are called "charge".
铁矿石、焦碳、石灰石装进炉子的顶部。这些东西叫炉料。
15.
Discussion on Mixed Combustion of Blast Furnace Gas and Natural Gas in Lime Kiln
石灰窑混烧高炉煤气和天然气的探讨
16.
Like definitions of fly ash ratio and bottom ash ratio, ash circulating ratio should be based on the amount of ash to furnace( including limestone).
它与飞灰份额、灰份额的定义一样,都应以入炉灰量(石灰石带入灰量)基准。
17.
Influence of limestone desulphurization to CFB thermal efficiency
添加石灰石脱硫对CFB锅炉热效率的影响
18.
Analysis on the problems in limestone system of 300 MW CFB boiler
300MW循环流化床锅炉机组石灰石系统问题分析