说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大唐太原第二热电厂
1.
Somewhat lower temperature phenomenon of main steam has been existing for a long time on boiler on.5 in Datang Taiyuan Co-generation Power.
大唐太原第二热电厂5号炉长期以来存在著主蒸汽温度偏低现象。
2.
Composition Analysis on "Replacing Small Units with Large Ones" for Taiyuan Second Power Plant
太原第二热电厂“上大压小”节能减排综合效益分析
3.
The Practice of Digital Mapping of Yangpogou Cinder Dump at Taiyuan Second Thermoelectric Power Plant
太原市第二热电厂阳坡沟灰场数字化成图实践
4.
Caoqiao Gas-fired Cogeneration Plant, Taiyanggong Gas-fired Cogeneration Plant, and gas turbine units of the Third Cogeneration Plant (phase I and II) will be constructed.
建设草桥燃气热电厂、太阳宫燃气热电厂、第三热电厂燃气发电机组一期和二期工程。
5.
On the Upgrading of Individual Batch System of Taiyuan First Thermal Power Plant
太原第一热电厂入炉煤分炉计量系统的改进
6.
Analysis and Forcast on the Second Stage of Heat-supplying Market of Datang Changchun Second Thermal Power Co.Ltd;
大唐长春第二热电有限责任公司二期供热市场分析及预测
7.
Application of gas tower integration to China Datang Harbin No.1 Thermal Power Plant
烟塔合一技术在大唐哈尔滨第一热电厂工程中的应用
8.
The Utilization of Industrial Television Monitoring System in the Second Coking Plant of TCGC
工业电视监控系统在太原煤气化第二焦化厂中的应用
9.
5~# Unit Low Vacuum Transformation in Baotou Secondary Thermal Power Plant
包头第二热电厂5~#机低真空改造
10.
Post-Evaluation for Phase Eight Extension Project of Datang Baoding Co-Generation Power Plant;
大唐保定热电厂八期扩建工程项目后评价
11.
Analysis for Shutdown of 100 MW and Below Generating Units in Datang Changshan Thermal Power Plant;
大唐长山热电厂100MW及以下机组关停分析
12.
Karst Development Law and Treatment Measures of Foundation in Datang Power Plant,Linzhou
大唐林州热电厂岩溶发育规律及地基处理方案
13.
Thermal Performance Study of the CHP System for BaoTou Second Thermal Power;
包头第二热电厂热电联产系统的热力性能分析研究
14.
Plan Demonstration of Automatic Installation for System Safety in Taiyuan Gangue Heat & Power Plant
太原煤矸石热电厂系统安全自动装置方案论证
15.
Experimental Investigation and Administration of Fouling of Boiler #7 of Baotou Second Thermo-eletrie Plant;
包头第二热电厂#7炉结渣的试验研究与治理
16.
Pre-heating project of centralized heating(second plant) in stage of passing through Fen river in Taiyuan
太原市集中供热(二电)穿越汾河段预热工程
17.
New York Chinatown is the second largest one in the United States.
纽约的唐人街是美国第二大的唐人街。
18.
Control on Schedule and Quality during Engineering Regulation Process for Tuoketuo Power Plant, Phase II;
大唐托克托电厂二期工程调试过程中工期和质量的控制