1.
Some issues of early-stage work for Dateng Gorge Hydraulic Complex
关于大藤峡水利枢纽工程前期工作的几点思考
2.
Development restructuring on Dateng gorges water project and benefit analysis;
大藤峡水利枢纽建设思路调整与效益分析
3.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
4.
Fatigue Test Analysis for Super-Large Bellow Pipe Used in Pressure Pipe for The Three Gorges Project
三峡水利枢纽工程压力管道用超大型波纹管疲劳试验分析
5.
On the Experiences and Lessons of the Decision-making of the Construction of Sanmenxia Water Conservancy;
试论三门峡水利枢纽工程决策的经验教训
6.
Some Successful Experience from Project Construction and Management of Jiudianxia Water Control Project;
九甸峡水利枢纽工程建设管理的成功做法
7.
The Evaluation and Analysis of Dynamoelectric Benefits of Feilaixia Hydro-junction Project;
飞来峡水利枢纽工程发电效益评估分析
8.
Practice on the Third Phase Construction and Management of Three Gorges Project
长江三峡水利枢纽三期工程建设管理实践
9.
Three Gorges Project Construction Management System and Its Implications
三峡水利枢纽工程建设管理体制及启示
10.
Quality Management for the Third Phase Construction of Three Gorges Project
长江三峡水利枢纽三期工程质量管理简介
11.
Research summary of key technologies on electro-mechanical design of TGP
三峡水利枢纽工程机电设计关键技术研究概述
12.
The paper introduces the radar exploration technique used in Feilaixia water complex.
本文介绍了探地雷达技术在飞来峡水利枢纽工程中的应用。
13.
Application of GPS RTK and aerial photogrammetry technology in surveying Xiajiang Hydro-junction Project
航空摄影测量与RTK技术在峡江水利枢纽工程测量中的应用
14.
Research on the Calculational Method of the Production Population’s Allocation for the Lechang Gorge Irrigation Works Hinge in Guangdong Province
乐昌峡水利枢纽工程生产安置人口计算方法探讨
15.
Study on Seepage in the Dam Base of Xiaolangdi Project on Yellow River;
黄河小浪底水利枢纽工程大坝坝基渗流分析
16.
Study of navigation flow condition for Xiafu Hydraulic Complex
下福水利枢纽工程通航水流条件研究
17.
Organization of completion documents of Xiafu Hydraulic Complex
浅谈下福水利枢纽工程竣工资料整理
18.
Research on the Filled Soil Subarea in the Construction of Sanyadalong Hydroelectric Project;
三亚大隆水利枢纽工程大坝施工填料分区利用研究