说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 出行时间成本
1.
The Measurement Method for the Travel Time Cost and the Analysis of Its Influencing Factors;
出行时间成本的测算方法及其影响因素分析
2.
basic batch run-time routine
基本成批运行时间程序
3.
Many different measures of impedance can be used, such as travel distance, travel time, or travel cost.
可以采用很多种不同的阻抗计算方法,比如,出行距离,出行时间,或出行成本。
4.
Beijing Residents' Travel Time Survey in Small Samples
北京市居民出行时间小样本调查分析
5.
Optimal time partition of TOU price based on cost-time curve;
利用成本-时间曲线进行分时电价最优时段划分
6.
downbound exit
下行(水)出闸时间
7.
We will arrange the best suitable departure and return schedule for any tour groups.
至于启程时间与回程时间,本公司将为您作出最妥当的时间安排或依照本公司所设的行程表。
8.
Land Occupation and Cost of Private Car Trip on Urban Area;
私人小汽车出行土地空间资源占用及成本研究
9.
type with two empty spaces between lines.
打字时在行间空出两行。
10.
APPLICATION OF SYSTEM DYNAMICS MODEL IN PROJECT TIME AND COST ESTIMATE;
运用系统动力学模型进行项目时间/成本估算
11.
The assembly line and standardization made possible the production of large numbers of cars in a short time at low cost.
装配线和标准化使短时间内生产出大量成本低的汽车成为可能。
12.
and giving a space for setting down the gain made or the loss suffered on arrival at each locality.
每到一处,查对一下这本旅行日记,就能算出早到或迟到多少时间。
13.
This is the readout circuit in the time-of-f light electronics for the Beijing Spectrometer, BES.
本文介绍了北京谱仪飞行时间法电子学中的读出电路部分。
14.
This machine greatly shorten the time between shoe style design and sole form completion.
本机的出现,大大缩短开发鞋款的设计时间及样片的制成。
15.
They went on a journey with incense association, maily in the spring.
河南朝山的香客多以地缘的关系结成香社出行,时间以春季为多。
16.
On occasion, this separation will exist because of interference by the state for national reasons.
有时这种分隔是由于某个国家出于本国的原因进行干预而形成的。
17.
In the last ten years or so, banks' senior managers have taken operations out of branches in order to reduce the cost of their networks.
在过去十年左右的时间里,银行的高级经理为了降低银行网点的成本已经将一些业务收回总行。
18.
Under the FIFO method, costs of the current period are allocated to the ending Work in Process Inventory in the department and to the completed units.
在先进先出法下,本期发生的成本要在期末在产品和完工产品间进行分配。