说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 不相容工件族分批排序
1.
An Unbounded Batch Scheduling Problem with Incompatbile Job Families to Minimize the Weighted Total Completion Time
一类无界的不相容工件族分批排序加权总完工时间问题
2.
The Single Machine Parallel Batch Scheduling Problem with Job Compatibility Constraints;
具有相容约束条件的单机平行分批排序问题
3.
The Parallel Batch Scheduling Problem with Family Jobs and Equal Processing Time to Minimize the Weighted Total Completion Time
加工时间相同的分族分批排序加权总完工时间问题
4.
Jobs Scheduling with Delivery Time on A Single Batch Machine;
工件带运输时间的单机分批排序问题
5.
Minimizing the Number of Tardy Jobs when p and d Is Agreeable on a Single Machine Parallel Batch Scheduling with Family Jobs
p与d一致时的分族分批排序误工个数问题
6.
Minimizing the Number of Tardy Jobs with a Subset T of the Jobs to Be Sure on Time
部分工件必须不误工的误工排序问题
7.
A Single Batch Processing Machine with Nonidentical Job Sizes and Precedence constraints;
工件有优先约束和尺寸的单机分批排序问题
8.
A Kind of Batching Schedule Problem with Chain Precedence Constraints
一类工件带有优先约束的分批排序问题
9.
An Unbounded Batch Scheduling with Rejections
工件加工可拒绝的无界批量分批排序问题的几点探讨(英文)
10.
A Batching Scheduling Algorithm for Maximizing Total Weigted Number of Jobs Completed in Due Date Window;
交货时间区间内加权完工工件个数最大的分批排序算法
11.
Parallel-batch Scheduling with Multi-agent Jobs to Minimize the Weighted Number of Tardy Jobs
最小化加权误工工件数的多代理平行分批排序(英文)
12.
PTAS for Scheduling Jobs with Release Rates on Parallel Batch Processing Machines
工件有到达时间的平行机分批排序问题的一个PTAS算法(英文)
13.
Research on m*n Different Ordinal Scheduling Algorithm;
m*n不同顺序工件排序算法的研究
14.
The Single Machine Parallel-batching Scheduling Problem with Equal Processing Time;
具有等长工件平行批排序模型的一些结果
15.
Semi On-line Scheduling for Jobs with Similar Lengths
工件具有相似长度的半在线排序问题
16.
The Controllable Batch Scheduling and Supply Chain Scheduling Problems;
可控分批排序及供应链排序问题研究
17.
Scheduling a Batching Machine and On-line Scheduling on Parallel Machines;
单机分批排序和平行机在线排序问题
18.
A StUDY ON OP IMAL SOR ING ALGORI HM OF WORKPIECE PROCESSING RELA IVE SUPERIOR RECURRENCE ME HOD
工件加工最优排序算法研究——相对优势递推法