说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 超大沉井
1.
Subsidence Monitoring Technology of Extra Large Caisson in Taizhou Bridge
泰州大桥中塔超大沉井下沉监控技术
2.
Application of High-fluidity Underwater Concrete in Bottom Sealing of Extra Large Caisson of Taizhou Bridge
大流态水下混凝土在泰州大桥超大沉井封底施工中的应用
3.
Monitoring Technique for Sinking Resistance of Large Caisson Group
大型沉井群的沉井下沉阻力监测技术
4.
Construction Technology for Ultra Large Open Caisson in Redevelopment Work of Urban Drainage System
城市排水系统改造工程中的超大型沉井施工技术
5.
Cementing Techniques of Large Displacement Ultra-shallow Horizontal Wells in Jinlou Oilfield
井楼油田超浅层大位移水平井固井技术
6.
ERW Drilling and Completion Technology in Ultra-Shallow Heavy Oil Reservoir with Conventional Vertical Rig
直井钻机钻超浅层稠油大位移水平井钻井完井技术
7.
Construction Technology for Draining-sinkage for South Caisson Anchorage to Taizhou Yangtze River Highway Bridge with Large-sized Sunk Well
泰州大桥南锚碇巨型沉井排水下沉施工技术
8.
The Research of Interaction between Large Sunk Well Foundation and Foundation Soil;
大型沉井基础与地基土共同作用研究
9.
Technique Measures in the Construction of Open Caisson for the Dalian Xinghai No.1 Bridge;
大连市星海1号桥锚碇沉井施工技术
10.
Application of Hydraulic Suction Method in Larger Open Caisson Construction
水力冲吸法在较大沉井施工中的应用
11.
Main Points on the Construction of Circulating Pump Room in Large Thermal Power Plant
大型火力发电厂循泵房沉井施工要点
12.
The Apply of Large-sized Sinking Open Caisson on Built Island on Large Bridge of Shatian-Gangjiang River
大型筑岛沉井在沙田赣江特大桥中的应用
13.
Large Caisson Location Technology for Intermediate Tower of Taizhou Yangtze River Highway Bridge
泰州长江公路大桥中塔大型沉井定位施工技术
14.
On Sinking Well Construction of Circulating Water Bumping Room of Ningde Power Plant in Datang, Fujian
福建大唐宁德电厂循环水泵房沉井施工
15.
On pile cap open caisson construction scheme of super-large bridge of Zhongying expressway Yellow River in Ningxia
宁夏中营高速黄河特大桥承台沉井施工方案
16.
Research of Positioning Scheme for Caisson of Intermediate Tower of Taizhou Changjiang River Highway Bridge
泰州长江公路大桥中塔沉井定位方案研究
17.
On the design and construction of the sunk well and cofferdam base in the over-sized Bridge on Songhuajiang
沉井围堰基础在松花江特大桥上的设计与施工
18.
The Rapid Construction Technology of Inclined Mine Shaft of Super-large Cross-section Above Bedrock in Wang Huajialing Mine
王家岭煤矿超大断面斜井井筒基岩段快速施工技术