1.
Research on Cast-in-Place Cantilever Construction Technology of Cable-Stayed Truss Bridge
斜拉桁架桥的悬臂浇注施工工艺研究
2.
Structure Analysis and Design Research of Prestressed Concrete Chord-Stayed Truss Bridge;
预应力混凝土斜拉桁架桥结构分析与设计研究
3.
Analysis of Mechanical Behavior in Construction of Oblique-pulling Truss Bridge
斜拉桁架桥悬拼施工过程的力学行为分析
4.
Analysis for Stress of Truss Members and Stability of Structures in the Construction Process of Oblique-pulling Truss Bridges;
斜拉桁架桥安装过程中杆件应力和结构稳定分析
5.
Techno-economic analysis of erection of large-span cable-stayed steel truss bridges;
大跨度钢桁梁斜拉桥架设技术与经济分析
6.
Construction Techniques of Cable-stayed Cantilever Truss Beam
小溪塔大桥斜拉悬臂桁架梁施工技术要点
7.
Local Stress Simulation Analysis at Node of One Inclined Truss Bridge
某斜拉式桁架桥节点局部应力仿真分析
8.
Mechanics Characteristics and Construction Control of Prestressed Concrete Oblique-pulling Through Truss Bridge;
预应力斜拉下承式桁架梁桥受力特性与施工控制
9.
Analysis of the combination of plate-truss cable-stayed bridge non-linear analysis of space
板桁结合斜拉桥空间非线性静力分析
10.
One of the most noticeable structual differences between the cable-stayed bridge and the truss and girder types lies in the field of flexibility.
斜拉桥与桁架和梁式类型桥之间,在结构上的一个最显著不同之处,在于柔度方面。
11.
Finite Element Analysis of the Exceed Statically Determinate Cable-stayed Truss Structure;
超静定斜拉式桁架结构的有限元分析
12.
Closing of the Cable-stayed Wuhu Yangtze River Bridge Middle Main Span of Steel Truss Beam
芜湖长江大桥主跨钢桁梁斜拉桥跨中合龙施工
13.
Analysis of the Ultimate Load for Long Span Cable-Stayed Bridge with a Plate-Truss Composite Beam;
大跨度板桁结合主梁斜拉桥极限承载力分析
14.
Analysis of Property of Ultimate States of Steel Truss Road and Rail Cable-Stayed Bridges
基于极限状态法的钢桁梁公铁斜拉桥结构分析
15.
Nonlinear Analysis of Static and Dynamic Properties of Long Span Cable-stayed Space Truss;
大跨度斜拉立体桁架的静动力非线性分析
16.
Studies on the Static and Stable Properties of the Cable-stayed Space Trusses in a Gymnasium;
某体育馆斜拉空间桁架的静力与稳定研究
17.
Analysis and fitting to nodal displacements of cable-stayed truss with triangular cross-section after applying prestressing force
斜拉桁架施加预应力后的节点位移分析与拟合
18.
Study on Cable Tension Optimization of Cable-stayed Bridge in Segmental Scaffold Construction Method;
支架节段现浇法斜拉桥索力优化研究