说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 勘探施工
1.
Exploration Construction Enterprise and ISO9002 Quality Certification;
勘探施工企业与ISO9002质量认证
2.
The Research on the Technical Risk Management of Seismic Exploration Operation of ShengLi Geophysical Company;
胜利物探地震勘探施工技术风险管理研究
3.
Discusses in shallowly the exploration construction the small well field work importance
浅谈勘探施工中小井调查工作的重要性
4.
Development of case base for geological prospecting engineering CAD system
地质勘探施工技术辅助设计软件范例库的开发
5.
Class C: solid mineral exploration; geophysical exploration; establish mineral exploration infrastructure (pitting).
2630213丙级:固体矿产勘查;地球物理勘查;勘查工程施工(坑探)。
6.
The Discussion of Water Diversion Tunnel Survey Work Using Shield Method Construction
采用盾构法施工的引水隧洞勘察工作要点探讨
7.
Class A: solid mineral exploration.
061775甲级:固体矿产勘查;勘查工程施工。
8.
Conduct of Re employment Project in the Geological Prospecting Units: Obstacles and Counter measures;
地勘单位实施“再就业工程”的障碍分析及对策探讨
9.
Application of Wireline Core Drilling in Coalfield Ultra Deep Boreholes
绳索取心钻进技术在煤田勘探超深孔施工中的应用
10.
A fast method of ascertaining the best construction factor in two-dimensional seismic exploration
一种快速确定二维地震勘探最佳施工因素的方法
11.
Design of Seismic Exploration Line on the Basement Rift in Kunming Basin and Experimental Analysis for Construction Parameters
昆明盆地基底断裂地震勘探测线设计及施工参数试验分析
12.
Prospecting is already in progress.
勘探工作已经在进行。
13.
minimum exploration work program
最低限度勘探工作量
14.
ploration costs in extractive industries
采掘工业中的勘探成本
15.
engineering geological survey and exploration
工程地质测绘和勘探
16.
The Measurements to Take Back the Project Arrears;
谈地勘施工单位对拖欠工程款的对策
17.
AMT MEHOD OF APPLICATION SURVEY TO RAILWAY TUNNEL INVESTIGATION
AMT法在工程隧道勘测施工中的应用
18.
How to Implement Oversea Exploration Development Strategy for SINOPEC;
石化集团如何实施海外勘探开发战略