说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡右岸
1.
Features of the Alarm Mechanism of Computer Supervisory System of Three Gorges Right Bank Power Station
三峡右岸电站监控系统报警机制特点
2.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
3.
Function Design and Implementation of AVC in Three Gorges Right Bank Hydropower Station
三峡右岸电站AVC功能设计及实现方法
4.
Three Gorges Right Bank First-stage River Diversion Concrete Dam Body Joint Grouting
三峡右岸一期导流工程混凝土坝体接缝灌浆
5.
Study on Stator Fault Modalities and Main Protection Schemes of the Three Gorges Right Bank Generators;
三峡右岸机组定子故障形式及主保护方案研究
6.
Electric braking on the right bank of the Three Gorges power station on the relay the impact of downtime
三峡右岸电站电气制动停机对继电保护的影响
7.
Hydraulic turbine key components of Three Gorges right bank NC technology
三峡右岸水轮机关键部件数控加工技术研究
8.
A method to resolve the Electrical Braking Failure in Three Gorges Right Bank Hydropower plant and its Application
三峡右岸电气制动改进方案分析与应用
9.
The Deformation Reason after a Process of Stress Relief for the Runner of the Three Gorges Right Bank Hydropower Station
三峡右岸首台转轮退火后变形原因的分析
10.
Analysis and improvement of generator-transformer protection of Three Gorges Right Bank Hydropower Station
三峡右岸电站发电机变压器保护分析及改进
11.
Standardized commissioning test procedure for SCADA system in right bank of Three Gorges
三峡右岸水电站监控系统的标准化调试
12.
Man-machine interface design of computer monitoring system for Three Gorges
三峡右岸电站计算机监控系统人机界面设计
13.
Application of Redundancy Mode to the Left-bank Computer Monitoring System for the Three Gorges Project
冗余方式在三峡右岸计算机监控系统中的应用
14.
Research on Key Technologies of Installed in Three Gorges Right Bank Station Fully Air Cooled Hydro-generators
三峡右岸全空冷水轮发电机关键技术研究
15.
The Installation and Test of the Hydraulic Turbine Guide Bearing of Three Gorges Right Bank Power Station
三峡右岸机组水导轴承安装及调试特点
16.
General design for monitoring system of TGP right bank power station and underground power station
三峡右岸及地下电站监控系统总体方案设计
17.
Brief analysis on shaft axis alignment of DFEM hydropower unit in Three Gorges Right Bank Hydropower Station
三峡右岸电站东电机组轴线调整简要分析
18.
Load Rejection Calculation for TGP Right Bank Power Station Hydro-generator
三峡右岸水电站水轮机过渡过程计算分析