说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 扣拱
1.
On the large-span and supporting arch key technique of PBA construction method on Qingnian avenue station
青年大街站PBA工法大跨扣拱关键技术
2.
Technology of Top-down Bored Excavation with Cast-in-situ Arch for Metro Station Construction
一次扣拱暗挖逆作法修建地铁车站新技术
3.
Calculation of stayed buckle cable forces for concrete filled steel tubular arch bridge with long span in process of lifting
大跨度钢管砼拱桥拱肋吊装中的扣索索力计算
4.
OPTIMIZATION OF STAYED-BUCKLE CABLE FORCES DURING ADJUSTMENT OFTHE LINE-SHAPE ON LONG SPANARCH BRIDGE
大跨度拱桥拱肋线形调整中的扣索索力优化
5.
The Line Shape Control of Ateel Box Arch Rib of External Slanted Arch Brigdge;
外倾式钢箱拱桥扣索吊装拱肋线形控制
6.
The Design and Construction of Buckle Point of Long Spam Concrete Arch Brige
大跨径混凝土拱桥拱箱扣点设计及施工
7.
A Study on Cable-Removing Scheme for Cable-Stay System of CFST Arch Bridge
某钢管混凝土拱桥斜拉扣挂系统拆扣方案研究
8.
Measurement and Analysis for Cable Tension of Steel Arch Bridge
钢管拱桥扣索塔缆索张力测试与分析
9.
Calculation of Stayed-buckle Cable Force for Concrete-filled Steel Tubular Arch Bridge with Long Span during Lifting
大跨度钢管混凝土拱桥拱肋吊装中的扣索索力计算
10.
Adjustment of Buckle-cable Forces Under Cable-hoisting Construction of Concrete-filled Steel Tubular Arch Bridges
钢管混凝土拱桥主拱钢管缆索吊装扣索索力调整(英文)
11.
The Application of Limit Length of Cable Method in Long-Span Concrete Filled Steel Tubular Arch Bridge s Rib Assembling;
定长扣索法在大跨径钢管混凝土拱桥拱肋安装中的应用
12.
Geometrical Analysis of Arch Rib Elevation Change Caused by Tower Deviation during Cable-Hoisting Construction
缆索吊装扣塔偏位对拱肋高程影响的几何分析
13.
Application of Cable-stayed Suspending and Connecting Method in Half-through Steel-pipe Concrete Arch
斜拉扣挂法在半穿式钢管混凝土拱的应用
14.
Solution on Cable Force and Segmental Camber in Arch Bridge Construction by Modified Inverted Method
用倒拆修正法计算拱桥施工扣索索力与预抬量
15.
Application of cable erection and strayed knotting method to construction of concrete filled steel tubular arch bridge
缆索吊装斜拉扣挂法在钢管混凝土拱桥施工中的应用
16.
Study on the Feasibility of Using Curved Approach Bridge as the Fastening and Anchorage Balance System for Steel Tubular Arch Hoisting;
弯曲引桥作为钢管拱吊装扣锚平衡系统的可行性研究
17.
Analysis of Cable Force and Pre-camer during Arch Rib Installation of Daninghe Bridge;
大宁河特大桥拱肋安装斜拉扣索索力与预抬量计算分析
18.
Study on Calculation Method of Optimal Stayed-Buckle Cable Force for Reinforced Concrete Arch Bridge with Cantilever Cast Method;
悬臂浇筑钢筋混凝土拱桥最优扣索索力计算方法研究