说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙华口水电站
1.
The Planning and Construction of Roller Compacted Concrete Dam of Longhuakou Hydroelectric Station in Yu County
盂县龙华口水电站碾压混凝土大坝规划与施工
2.
The Quality Control in the Construction of High-pressure Jet-grouting Watertight Wall of the Construction Diversion Cofferdam of Longhuakou Hydropower Station
龙华口水电站施工导流围堰高喷防渗墙施工质量控制
3.
The study for the flip bucket style optimization test in Longkaikou hydropower station
龙开口水电站挑坎体型优化试验研究
4.
RCC Engineering Technique Applied to Intake Section of Longtan Hydropower Station
龙滩水电站进水口坝段碾压混凝土施工技术
5.
Concrete Temperature Control for Intake Dam Section of Longtan Hydropower Station
龙滩水电站进水口坝段混凝土温度控制
6.
Contact grouting construction for intake steel linings on left bank of Longtan Hydropower Station
龙滩水电站左岸进水口钢衬接触灌浆施工
7.
Expermental Research on Inlet-Outlet Hydraulics of Upper Pool in Wulongshan Pumped-Storage Hydroplant;
乌龙山抽水蓄能电站上库进水口水力特性实验研究
8.
Slope Stability Analysis and Countermeasures of Intake Diversion Tunnel at the Left Bank of Longtan Hydropower Station;
龙滩电站左岸导流洞进水口边坡稳定分析及防治对策
9.
The Rock Mass Structure Features and Its Control Seepage Mechanism of Longkaikou Hydroelectric Power Station Dam Base on Jinsha River;
金沙江龙开口水电站坝区岩体结构特征及其控渗机理研究
10.
Rock Station Quality Assessment and Feedback Study on Excavation of Long Kaikou Hydropower Station
龙开口水电站坝基岩体质量评价及开挖施工信息反馈研究
11.
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
12.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
13.
Study of RCC Arch Dam Structure of Longshou Hydropower Project;
龙首水电站碾压混凝土拱坝结构研究
14.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
15.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
16.
Excavation and Construction of Extra Large Caverns at Longtoushi Hydropower Station
龙头石水电站特大洞室开挖施工技术
17.
Longtan hydropower control project layout and foundation treatment design
龙潭水电站枢纽布置及基础处理设计
18.
Diversion cofferdam design and the construction of Huilong hydropower station
回龙水电站施工导流围堰设计与施工