说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 锦屏一级水电站
1.
Study on Stability of Approach Channel Slope for Jinping I Hydropower Station
锦屏一级水电站引渠边坡稳定性研究
2.
Research on Slope Stability of Intake Slope on Right Bank of Jinping Ⅰ Hydropower Station;
锦屏一级水电站右岸进水口边坡稳定性研究
3.
Study of the Problem about Hydrogeochemisty of Jingpin Hydroelectric Power Station;
锦屏一级水电站坝区水文地球化学问题研究
4.
Stability Analysis on Ⅳ-Ⅳ Slope of Jinping Ⅰ Hydropower Station;
锦屏一级水电站Ⅳ-Ⅳ山梁边坡稳定性分析
5.
Study on the Stability of the Spandrel Groove High Slope of Jinping Hydroelectric Power Station;
锦屏一级水电站拱肩槽边坡稳定性研究
6.
On tender document consultation for the first-cascade Jinping hydropower project;
锦屏一级水电站工程招标文件咨询的几点体会
7.
Investigation of Zooplanktons in the Areas of Jinping Hydroelectric Station Before the Building of the Reservoir;
锦屏一级水电站建库前的浮游动物调查
8.
Role of Jinping I Hydropower Station upon Social and Economic Development of Sichuan;
锦屏一级水电站对四川社会经济发展的作用
9.
The Stability Analysis of the Fracturing and Deformation Body on the Left Bank of Jinping I Hydropower Station
锦屏一级水电站左岸变形拉裂体稳定性分析
10.
Suppressing Measures Against Alkali-silica Reaction in the Dam Concrete for the Jinping-Ⅰ Hydroelectric Project
锦屏一级水电站大坝混凝土ASR抑制措施研究
11.
Analysis of Stability for the Right Spandrel Groove Slope of Jinping I Hydropower Station
锦屏一级水电站右岸拱肩槽边坡稳定性分析
12.
Research on the seismic safety of high arch dam system of Jinping Project
锦屏一级水电站高拱坝整体抗震安全性研究
13.
The Study of the High Arch Dam Exceptionally Large Foundation Cushion Stability of Jinping 1 Hydropower Project
锦屏一级水电站高拱坝大垫座稳定性研究
14.
A new method to invert nonlinear stress field of underground powerhouse at Jinping first stage hydropower station
锦屏一级水电站地下厂区非线性地应力场反演
15.
Discussion about Safe Production Construction Organization Measures at Jinping 1~(st) Stage Hydraulic Power Station
锦屏一级水电站安全生产的施工组织措施
16.
Presplit Blasting in Excavation of High Slope at Right Bank of Jinping I Hydropower Station
锦屏一级水电站大坝右岸高边坡预裂爆破施工
17.
Jinping first stage hydropower station right bank slope rock mass random anchor construction
锦屏一级水电站右岸边坡岩体随机锚索施工
18.
Safeguard technology for excavating outgoing line yard of Jinping-Ⅰ Hydropower Station
锦屏一级水电站地面出线场开挖安全防护技术