说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 山岭公路
1.
Assessment of Grouting Quality and Guide of Grouting for Mountain Highway Tunnel
山岭公路隧道注浆效果评价及技术指南研究
2.
Fire Resistance Limit and Fire Protection of Mountain Highway Tunnel Structures
山岭公路隧道结构的耐火极限与防火保护问题
3.
Characteristic Analysis of Flue Gas Movement of Single-hole Double-direction Tunnel on Mountain Highway in Fires
山岭公路单洞双向隧道火灾中烟气运动特性分析
4.
Application of Ground Penetrating Radar to Gelolgical Forcast for Highway Mountain Tunnel
地质雷达在山岭公路隧道超前地质预报中的应用
5.
Study on the Construction Security Risk Identification of Highway Mountain Tunnel;
公路山岭隧道施工安全风险辨识研究
6.
Construction in Slip-form of Shaft No.2 in the Qinling Zhongnanshan Highway Tunnel
秦岭终南山公路隧道2#竖井滑模施工
7.
Excavation and Fiu of Stonework of High Grade Highway in Mountainous and Hiuy Terrain
山岭重丘区高等级公路石方开挖与填筑
8.
Study on Highway Mountain Tunnel Construction Security Risk Early-Warning Management System;
公路山岭隧道施工安全风险预警系统研究
9.
Technical Study on the Construction Method Applied for Zhong Nanshan Extra-Longer Tunnel in Qinling Mountain;
秦岭终南山特长公路隧道施工技术研究
10.
Design of Highway Tunnel Power Monitoring System of Qinling Zhongnan Mountain
秦岭终南山公路隧道电力监控系统设计
11.
The 3# Ventilation Shaft back well method Construction Technology of Qinling Zhongnanshan Highway Tunnel
秦岭终南山公路隧道3#竖井反井法施工技术
12.
Construction Technology of Slip-formwork in No.2 Tunnel Shaft of Qinling Zhongnanshan Highway
秦岭终南山公路隧道2号竖井滑模施工技术
13.
Anti-well construction technique of 3# shaft of Zhongnanshan road tunnel in Qinling
秦岭终南山公路隧道3号竖井反井法施工技术
14.
A Comparison on Schedules of Prefabricate Girder Yard for Expressway Bridges in Hill Area
山岭重丘区高速公路预制梁场设置方案的比选
15.
Darjeeling Himalayan Railway
喜马拉雅山大吉岭铁路
16.
Cause Distortion and Study of Repair Measure in Xiling Xueshan Tunnel of Da Shuang Road;
大双公路西岭雪山隧道变形原因及整治措施研究
17.
Discussion about Fast Construction Technology by Adopting Drilling and Blasting Method for Zhongnanshan Super Long Highway Tunnel in Qingling;
秦岭终南山特长公路隧道钻爆法快速施工技术探讨
18.
Discussion on advantages and disadvantages of concentrated precast and erection for voided slab beams with less than 20 meters in the heavy rolling area
山岭重丘区公路20m以下空心板梁集中预制安装的利与弊