说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水布垭水利枢纽
1.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
2.
Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;
水布垭水利枢纽特大断面导流隧洞施工技术
3.
Research on flood control investment allocation, money rising and return of investment of Shuibuya Water Conservancy Project;
水布垭水利枢纽防洪投资分摊及筹措和回报研究
4.
Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River . The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City.
水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。
5.
Research on Plane Layout for the Approach Channel of Navigable Constructions in Yinpan Hydro-junction;
银盘水利枢纽通航建筑物引航道平面布置研究
6.
Study on Layout Design for Low-head Hydro-junction in River Channel with Inadequate River Width
河宽制约下低水头河床式水利枢纽布置设计探索
7.
Safety Management of Changzhou Hydraulic Complex and Buckets Effect
长洲水利枢纽安全管理与“水桶定律”
8.
Study of navigation flow condition for Xiafu Hydraulic Complex
下福水利枢纽工程通航水流条件研究
9.
The Characteristis of the Planning for Water Control Projects: The Design of the Feilai Gorge Scenic Spot in Canton
水利枢纽景观规划特色探讨——广东省飞来峡水利枢纽景区规划设计
10.
Study on Cost Allocation Methods for Multiobjective Water Projects;
综合利用水利枢纽投资分摊方法研究
11.
Analysis and Optimization of Underground Power House Arrangement of Xiabandi Key Water-Control Project, Xinjiang
新疆下坂地水利枢纽工程地下厂房布置的分析与优化
12.
Experiment Research on the Buildings Optimized Layout at the Shipment Gate for Qingyuan Water Conservancy Hub Project
清远水利枢纽工程船闸通航建筑物优化布置试验研究
13.
Longtan hydropower control project layout and foundation treatment design
龙潭水电站枢纽布置及基础处理设计
14.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
15.
Analysis of the Operating Behavior of Concrete Dam of the Danjiangkou Hydro-junction
丹江口水利枢纽砼大坝工作性态分析
16.
Safety management for excavation of underground chambers and tunnels of Baise multipurpose dam project
百色水利枢纽地下洞室开挖安全管理
17.
On the Ski-jump Atomization Flow of the Three-gorge Project
三峡水利枢纽挑流雾化流问题的研究
18.
Design of Total Integration Auto System for Water Hinge in Donghe;
东河水利枢纽全集成自动化系统设计