说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 增容改造
1.
System Optimization Uprating Modification for 300MW Units in Yudong Power Plant
裕东电厂300MW机组系统优化与增容改造
2.
Economic Evaluation on Capacity Upgrade Project of 300 MW Home-made Turbine
国产300MW汽轮机增容改造经济性评价
3.
Research on the Capacity Increase and Transformation of Generators Based on the Engineering Practice;
基于工程实践的汽轮发电机组增容改造的研究
4.
The Research of Rehabilitating and Enhancing for Hydroelectric Set in Liujiaxia Hydropower Plant;
刘家峡水电厂水轮发电机组增容改造分析研究
5.
The Feasible Research of the Capacity Improvement for the 100MW Unit of LianCheng Power Station;
连城电厂100MW汽轮机节能和增容改造可行性研究
6.
Analysis and Processing of the Shafting Abnormal Vibration on the Capacity Extension Unit;
增容改造机组轴系异常振动的分析与处理
7.
Operation Stability of Gezhouba Hydropower Station after its Capacity Increasing
葛洲坝电站增容改造机组运行稳定性介绍
8.
Force Characteristic Test Technology and Application on Capacity-plus Transformation of Hydroelectric Generating Set
水轮发电机组增容改造力特性测试技术及应用
9.
The use of Hydraulic Fill Techniques on the Market for Power Plant Ash Transformation Compatibilizer
采用水力冲填法对发电厂贮灰场进行增容改造
10.
Runner structural design for hydropower station upgrade project
浅谈水电站增容改造中的转轮结构设计
11.
Capability-increasing Transformation for 310MW generator in Qinshan Nuclear Power Co. Ltd.
秦山核电310MW发电机增容改造的工程实践
12.
Conductor Selection for ±500 kV Jiyang Large Crossing Transmission Line Upgrading
±500kV吉阳大跨越输电线路增容改造导线选择
13.
Optimization and Capacity Increase Modification on the Bubbling Buring Boiler of SHF 35-39/450
关于SHF35-39/450沸腾燃烧锅炉的优化增容改造
14.
Reconstruction Project for Increasing Capacity of Conductor of the Second Crossing Sea Chunnel of Xiamen 220 kV Line:Performance and Spesical Construction Capacity-Technique of Increase-Conductor of Gap Type
厦门220kV跨海第二通道增容改造工程——间隙型增容导线的性能和特殊施工方法
15.
Hydraulic Turbine Model Acceptance Test of No.2 Unit of Xinanjiang Hydropower Station
新安江水电厂2#机增容改造水轮机模型验收试验
16.
The Key Technology Research of Unit increasing Capacity Rebuilding for GHPP and Project Management;
葛洲坝电站机组增容改造关键技术研究及工程项目管理
17.
Capacity-increasing Rebuilding Syudies and Construction Analysis on 3rd Generator of Gezhouba;
葛洲坝3号发电机增容改造研究及施工技术分析
18.
Study on Asymmetry Three Governors of Electric Control System for Wujiang Hydroelectric Plant, Guizhou Province, China;
乌江渡增容改造250MW机组非对称三机调速器电气控制系统研究