说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 机组调试
1.
Cause Analysis on Large Vibration of Induced Fan During Commissioning of a 1000MW Power Unit
1000MW机组调试期间引风机振动大的原因分析
2.
Summary and Analysis on Operation Test of Air Conditioner Set on Generator Car
发电车空调机组运用试验总结与分析
3.
Regulation Testing Research of Combustion on 500MW Boiler;
500MW锅炉机组燃烧调整试验研究
4.
Test Research on the Peak-load Regulation with Deep Vacuum Operation of 100MW Units;
100MW机组低真空深度调峰试验研究
5.
Construction,Installation and Commissioning Experiences for 900 MW Units;
900MW机组的施工、安装和调试经验
6.
Study on Combustion Adjustment of 600MW Supercritical Pressure Boiler
600MW超临界机组锅炉燃烧调整试验研究
7.
The primary frequency regulation test on 135 MW circulating fluidized bed units
135MW循环硫化床机组一次调频试验
8.
Assembly and debugging technique of TB880E shield in the narrow space
TB880E掘进机狭小场地组装调试技术
9.
DEH Valve Commissioning for SIEMENS 1 000 MW Steam Turbine
西门子1000MW机组DEH汽门调整试验
10.
Debugging Experience of Boiler in 600MW Supercritical Unit
600MW超临界机组锅炉调试经验
11.
Discussion on Trial Test of Cooling Island System of Large Air-Cooling Unit
大型空冷机组空冷岛系统的调试探讨
12.
Summary on the start-up debugging and trial operation of the first generating units of Three Gorges Hydropower Plant
三峡电站首批机组的起动调试及试运行
13.
RESISTANCE TESTING AND ANALYSIS OF FOUR EVAPORATIVE COOLING AIR-CONDITIONING UNITS COMBINED
四级蒸发冷却组合式空调机组阻力测试与分析
14.
Check and adjust radial angular and axial misalignment both ends of coupling.
④检查并调整机组的径向、向及周向不对中至机组安装调试标准值。
15.
Check and adjust radial angular and axial misalignment both ends of coupling .
检查并调整机组的径向、角向及周向不对中至机组安装调试标准值。
16.
Primary Frequency Regulation Analysis for Generators of Central China Power Grid in 2009
2009年华中电网统调机组一次调频试验分析
17.
Features and Commissioning on Home-made Supercritical 600 MW Units of Small-sized Steam Turbine
国产超超临界600MW机组小汽轮机的特点及调试
18.
Analysis and Treatment of debug Faults for Feeder Water Pump Turbine in Supercritical Units
超临界机组给水泵汽机调试故障分析及处理