说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 主次梁
1.
Simple Discuss Reasonable Orrangement of Secondary Reinforcing Bar of Primary and Secondarry Beam
浅谈主次梁交叉部位负筋的合理排放
2.
Calculation and Analysis of Frame Supported Shear Wall Structure with Transfer Story of Orthogonal Beams and Secondary Beams;
主次梁转换层框支剪力墙结构计算分析
3.
The roof and the floor systems are directly supported by horizontal beams and girders spanning the distance between the vertical columns
屋面和楼板系统直接支承在跨越竖直柱子间距的水平主次梁上。
4.
Mechanical Behavior Research for High Strength Bolt Connection Joint of Main and Secondary Beam
主次梁承压型高强度螺栓连接节点受力性能研究
5.
FULL-SCALE EXPERIMENTAL STUDY ON THE REINFORCED CONCRETE BEAM-AND-GIRDER COMPOSITE NODES BEARING MONOTONIC LOADING
新型装配整体式混凝土结构主次梁节点试验研究
6.
Study on Static Behavior of Joint of Steel Sub-Beam and Concrete Beam
钢次梁—混凝土主梁节点静力性能研究
7.
Researches on Cooperative Work Mechanism and Design Method of Reinforced Concrete Main-beam-Sub-beam-Slab Structure
钢筋混凝土主梁—次梁—板结构协同工作机理及设计方法研究Ⅰ
8.
Compatibility Torsion Test of Spandrel Beam with Cast-in-Place Slab in Long-Span PC Secondary Beam Floor System
带板大跨度预应力次梁楼盖边主梁协调扭转试验
9.
The 1/2 subharmonic resonance and primary parametric resonance of inclined beam subjected to harmonic excitation in temperature field;
温度场中斜梁受简谐激励的1/2次亚谐-主参数共振
10.
The Load Bearing Capacity Test Study of Steel-Concrete Joint between the Rib and Y-Shape Rigid Frame and Joint between the Front Latered and Y-Shape Rigid Frame;
主拱肋与Y形刚构钢~砼接头和Y形刚构与前次横梁接头承载力试验研究
11.
The beam is divided in4 parts, two each sitting on each main girder.
箱梁分为4个部分,每根主梁上2个。
12.
The main girders support I-section transverse ribs.
主梁支承着工字梁的横向肋。
13.
Investigation of Long-Span Bridge Girder Spanwise Vortex-Induced Vibration
大跨度桥梁沿跨向主梁涡激振动研究
14.
The ANSYS Secondary Development Study for Space Computation Method of Cross Diaphragm in Box Girder;
箱梁内横隔梁空间算法的ANSYS二次开发研究
15.
Simulation of compatibility torsion experiments of a spandrel beam in a long-span prestressed concrete secondary beams floor system
大跨度预应力次梁楼盖边梁协调扭转模拟分析
16.
gantry crane with movable girder
可移动主梁门式起重机
17.
Test and Analysis of Compatibility Torsion in the Long-span P.C. Secondary Beams Floor System;
大跨度预应力次梁楼盖边梁——楼面梁协调扭转试验及研究
18.
The contemptible scoundrel made himself up and went on the stage once more.
这跳梁小丑又一次粉墨登场了。