说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 深厚覆盖层
1.
Some Problems about Construction of Deep to Overlay for Seepage Control Wall;
深厚覆盖层中防渗墙施工的若干问题
2.
The High Pressure Jet Grouting Technology in Deep and Thick Overburden Cofferdam of Big Interstice;
大空隙的深厚覆盖层围堰高压旋喷技术研究
3.
Study on Optimization of Anti-seepage System for Rockfill Dam on Deep Overburden Layer;
深厚覆盖层基础上堆石坝防渗系统优化研究
4.
Stability influence analysis on trench wall of seep proof screen in thick overburden layer
深厚覆盖层防渗墙槽壁稳定性影响分析
5.
Application of Comprehensive Geophysical Method to Deep Overburden Layer Exploration in River Bed
综合物探方法在河床深厚覆盖层勘探中的应用
6.
Calculation and Analysis of Dynamic Strength of 350 m High Core Rockfill Dam on Deep Overburden Foundation
深厚覆盖层350m级心墙堆石坝动强度计算分析
7.
Study on the Engineering Geological Property of Deep Overburden in the Danba Hydroelectric Power Station, Dadu River;
大渡河丹巴水电站坝基深厚覆盖层工程地质研究
8.
Dynamic Response and Stability Characteristic of Earrh-Rock Dam on Thick Overburden;
深厚覆盖层土石坝的动力响应特征及稳定性研究
9.
3-D FEM Dynamic Analysis on Asphalt Concrete Core-wall Rockfill Dam Built on Deep Overburden Layers;
深厚覆盖层上沥青混凝土心墙堆石坝三维动力分析
10.
Study on Seepage and Anti-seepage Structure Design of Sluice on Deep Gravel Cover;
深厚覆盖层上水闸渗流分析与防渗结构优化设计研究
11.
Grouting Construction Technique Study about Yele Hydroelectric Project Diaphragm Wall and Deep and Thick Overburden on Right Bank;
冶勒水电站防渗墙及右岩深厚覆盖层灌浆施工技术措施研究
12.
Study on Seepage Flow and Control of Deep and Thick Overburden of Sluice Foundation in the JinPin II Hydropower Station;
锦屏二级水电站闸基深厚覆盖层渗流分析与控制研究
13.
Nonlinear Coupling Research of Seepage-Stress Field in the Thick Overburden Layer of Dam Base;
坝基深厚覆盖层渗流场与应力场非线性耦合研究
14.
Study on the Basic Characteristics and Genetic Mechanism of the Thick Overburben Layer in China Southwest;
西南地区河谷深厚覆盖层基本特征及成因机理研究
15.
Study on the Engineering Geological Property of Deep Overburden in the Qizong Hydroelectric Power Station, Jinsha River
金沙江其宗水电站下坝址坝基深厚覆盖层工程地质研究
16.
FEASIBILITY STUDY ON CONSTRUCTION OF HIGH DAM AT MIDDLE REACHES OF JINSHA RIVER WITH THICK RIVERBED DEPOSIT
金沙江中游上江坝址河床深厚覆盖层建高坝可行性探讨
17.
SUITABILITY STUDY OF DIAPHRAGM WALL IN FOUNDATION TREATMENT WITH THICK OVERBURDEN LAYER
地下连续墙在深厚覆盖层地基处理中的适宜性研究
18.
Experimental Study on Curtain Grouting for Dam Foundation of Huangjinping Hydropower Station in Thick Overburden Layer
黄金坪水电站坝基深厚覆盖层帷幕灌浆试验研究