1.
Application of Strengthened Anchor Cable in Gate Monoliths of Permanent Navigation Lock
加固锚索在永久船闸闸首支持体中的运用
2.
Navigation through permanent ship locks and operation of the first group of generators will begin in 2003.
2003年实现永久船闸通航和首批机组发电
3.
Monitoring analysis on the seepage at curtain zone in permanent ship lock of TGP
三峡工程永久船闸帷幕区渗流监测分析
4.
MONITORING ANALYSIS ON PRESTRESS STATE OF ANCHOR CABLE OF HIGH SLOPE OF THE TGP PERMANENT SHIPLOCKS
三峡永久船闸高边坡锚索预应力状态监测分析
5.
Design of system Anchor rods for TGP permanent shiplock high slope
三峡工程永久船闸高边坡系统锚杆动态设计
6.
On the lining concrete design age of TGP permanent shiplocks
三峡永久船闸衬砌混凝土设计龄期探讨
7.
Study on Safety Monitoring Data Management System During Construction of TGP Permanent Lock
三峡永久船闸施工期安全监测数据管理系统
8.
Excavation Displacement Analysis by Distinct Element Method in Three Gorges Project;
三峡永久船闸高边坡开挖变形的离散元法分析
9.
The Lined Wall Design and Inspects of Three Gorges Permanent Navigation Lock;
三峡永久船闸砼衬砌墙结构设计与监测
10.
Study on Concrete Quality Control in the Floor the Three Structure of Gorges Project s Permanent Ship-locks;
三峡永久船闸地面工程混凝土质量控制与研究
11.
Evaluation and Analysis on High Side Slope Stability of Permanent Ship Brake in Three Gorges Project;
三峡工程永久船闸高边坡稳定性的评价与分析
12.
The Deformation Monitoring and Back Analysis of High Rock Slope of the Three Gorges Project Permanent Shiplock;
三峡工程永久船闸高边坡变形监测及反分析
13.
Monitoring of acoustic emission during rock deformation for high slope of the permanent shiplock structures of Three Gorges Project
三峡工程永久船闸高边坡岩体变形声发射监测
14.
Study of strength and stability for the chamber wall and the slope of the permanent lock in Three Gorges project
三峡永久船闸闸室墙及边坡的强度与稳定性研究
15.
Study on the Numerical Simulation of Deformation Mechanism of Middle Frusta and Vertical Border Wall at TGP Permanent Shiplock;
三峡永久船闸中隔墩和闸室直立边墙变形机理的数值研究
16.
Based on the deformation rating method, this paper discusses the study of deformation monitoring control indices for the Three Gorges Permanent Ship Lock Slope.
本文采用变形速率法,对三峡永久船闸变形监控指标进行探索。
17.
Application of two kinds of special mend materials in the treatment of the internal bug of the concreteof Three Gorges permanent ship lock
两种特殊修补材料在三峡永久船闸混凝土内部缺陷处理中的应用
18.
The acceptance test results showed that the construction of pre stressed anchorage cable of permanent ship lock meets the requirements of design.
验收试验成果表明 ,永久船闸预应力锚索的施工符合设计要求。