说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 地下洞室群
1.
Elementary Seismic Analysis of Underground Hydropower Cavern Groups
水电站地下洞室群地震反应初步分析
2.
Research for Mesh Generation of Finite Element Methods for Underground Cavity Group;
地下洞室群有限元网格剖分方法研究
3.
Modeling and Simulation for the Traffic and Transportation System of Underground Structure Group;
地下洞室群交通运输系统建模与仿真
4.
Study on the Construction Characteristic of Underground Carvens Group for Goupitan Hydropower Station;
构皮滩电站地下洞室群施工特性研究
5.
Numerical Simulation for Excavation of Underground Caverns Under High Geostress Conditions
高地应力下地下洞室群开挖过程的数值模拟
6.
Engineering Geological Study on the Stability of Rock Mass Surrounding Large Scale Underground Caverns;
大型地下洞室群围岩稳定性工程地质研究
7.
Stability Analysis on Adjoining Rock of Large-scale Underground Chamber Group of Suofengying Hydropower Station
索风营水电站大型地下洞室群围岩稳定分析
8.
Research on System Simulation Theory and Application for Construction Processes of Large-Scale Underground Structure Group;
大型地下洞室群施工系统仿真理论与应用研究
9.
Monitoring at Construction Period and Dynamic Reinforcement of Underground Power House Group;
地下洞室群施工期监测与动态支护设计研究
10.
Study on Work Behavior of Large Scale Underground Caverns of Hydroelectric Project;
大型水电工程地下洞室群工作性态研究
11.
Research on Underground Caverns Adjacent Stabilization and Support Parameters of LONGTAN Project;
龙滩工程地下洞室群围岩稳定和支护参数研究
12.
A Study on Numerical Simulation of Underground Caves Excavation and Engineering Application;
地下洞室群开挖数值仿真研究与工程应用
13.
Real-Time Control for Construction Scheduling of Large Scale Underground Structure Group;
大型地下洞室群施工进度实时控制研究
14.
Discussions on Some General Problems in 3-D Non-Linear FEM Analysis of Grouped Cavern;
地下洞室群三维有限元分析中若干问题探讨
15.
Jiangya underground powerhouse has 33 chambers in different size.
江垭电站地下厂房洞室群共有大小洞室33个。
16.
Construction control for engineering geologic body of underground power house chambers
地下厂房洞室群工程地质体施工控制
17.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真
18.
Research on Ventilation for Large Scale Underground Cavity Groups Construction;
大型地下工程洞室群施工期通风研究