说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 口岸站
1.
The Analysis of Production s Operation Management of the Freight-Passing Improvement in the Manchuria Railway Station Port;
对满洲里口岸站改进过货生产作业管理的思考
2.
The route passes the following stations: Dahuang port terminal station, Gangsha, Zhongbiaoshichang, Huaqianglukou.
(途经过的公共汽车站:皇岗口岸总站,岗厦,钟表市场,华强路口。
3.
"Frontier ports" means international seaports, airports, railway or bus terminals on the border, and ports of entry at land frontiers and boundary rivers.
“国境口岸”指国际通航的港口、机场、车站、陆地边境和国界江河的关口。
4.
Frontier Inspection Station Should Have the Criminal Detective Power over the Case of Running a Blockade in the Port
论边防检查站应有对口岸偷渡案件刑事侦查权
5.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价
6.
Research on Slope Stability of Intake Slope on Right Bank of Jinping Ⅰ Hydropower Station;
锦屏一级水电站右岸进水口边坡稳定性研究
7.
Analysis of the Stability of the Slope of the Outlet Section of Spillway Tunnel of Luding Hydropower Station;
泸定水电站右岸泄洪洞出口边坡稳定性研究
8.
Construction Technology for Transition Section of Diversion Tunnel at Left Bank of Guandi Hydropower Station
官地水电站右岸导流洞进口渐变段施工技术
9.
The analysis and treatment of the landslides on left bank of entrance of Wanjiakou Hydropower station
万家口水电站左岸进场路滑坡的分析及处理
10.
Contact grouting construction for intake steel linings on left bank of Longtan Hydropower Station
龙滩水电站左岸进水口钢衬接触灌浆施工
11.
This line passes the following stations: Dahuang port terminal station, Hua-qiang-nan, Jing-ji-da-sha, Man-ha-shang-chang.
沿途经过的的公共汽车站:皇岗口岸总站,华强南,经济大厦,曼哈商场。
12.
Airports, harbours and railway stations of entry or exit and other frontier ports, frontier stations and coastal defence stations.
(四)出境入境的机场、港口、火车站和其他边境口岸,边防海防哨所。
13.
At Dahuang port terminal bus station, take the NO.9 bus (loop line,De-xing-hua-yuan to Da-huang-kou-an) to Man-ha-shang-chang; 88 meters' walking.
到达皇岗口岸总站搭乘环线:德兴花园-皇岗口岸]到达曼哈商场;步行88米。
14.
Rock Deformation and Stability Assessment of the Intake on the Left Bank for Xiluodu Hydroelectric;
溪洛渡水电站左岸进水口工程岩体变形及稳定性评价
15.
The Stability Analysis of High-rock Slope on the Right Bank Spillway Tunnel of Luding Hydroelectric Station;
泸定水电站右岸泄洪洞出口边坡稳定性数值分析
16.
Slope Stability Analysis and Countermeasures of Intake Diversion Tunnel at the Left Bank of Longtan Hydropower Station;
龙滩电站左岸导流洞进水口边坡稳定分析及防治对策
17.
Study on Stability of the Quasi-bedded and Counter-tilt Rock Slope in Right Bank Diversion Tunnel Inlets of Nuozhadu Hydropower Station;
糯扎渡水电站右岸导流洞进口似层状反倾岩质边坡稳定性研究
18.
Study on Stability of Intake High Slope on Pilot Generating System of Jinchuan Hydro-power Station in Dadu River
大渡河金川水电站左岸引水发电系统进水口高边坡稳定性研究