说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 旅游开发建设项目
1)  tourism development construction project
旅游开发建设项目
1.
The environment impact assessment of tourism development construction project in there,it should be according to the special nature and social environment condition,completely and note emphasis to analyse and forecast the environment impact of tourism development construction project,then contrapose the impact and give the feasible and effectual environment protect measure.
风景名胜区旅游资源必须实行保护性开发,在风景名胜区内的旅游开发建设项目环境影响评价工作,应根据风景名胜区较为独特的自然和社会环境状况,全面并有重点地对旅游开发建设项目所带来的环境影响进行分析预测,有针对性地提出切实可行并行之有效的环境保护措施。
2)  new tourist items development
旅游新项目开发
3)  Tourism Development Project
旅游开发项目
4)  tourism project development
旅游项目开发
1.
On the basis of determining the technical and economic appraisal concept for tourism projects,this thesis studies the significance,purpose,mission,fundamental content and priority content of the method which uses the technical and economic appraisal concept to analyse the feasibility of tourism project development.
对旅游项目开发进行技术经济论证的主要目的在于为开发规划和投资决策提供科学依据,以提高项目决策的成功率,促进投资决策的科学化。
5)  touring development and construction
旅游开发建设
6)  development project
开发建设项目
1.
It introduces the application of remote sensing technique to the working process and key steps of soil and water conservation monitoring of development projects by taking Hongjiadu Hydro-Power Station as an example.
以洪家渡水电站为例介绍了遥感技术在开发建设项目水土保持监测中应用的工作流程和关键步骤。
2.
Adopting the law of measure coefficient,soil and water loss amounts of plasticity geography during development project is calculated,the veracity of prediction of soil and water loss in the stage is increased greatly,the theoretic basis is offered for the working-out of soil and water conservation scheme of the construction project.
采用实测系数法,推算出开发建设项目施工期各类再塑地貌产生的水土流失量,大大提高了该阶段水土流失预测的准确性,为开发建设项目水土保持方案防治措施的制订,提供了可靠的理论依据。
补充资料:报批建设项目用地


报批建设项目用地


【报批建设项目用地】在审批建设项目用地过程中,按征用土地审批权限规定,需报_L级人民政府进行审查批复的活动。土地管理部门报批建设项目用地,除用地单位正式申报建设用地时按土地审批权限抄报给上级土地管理部门有关附件外,还应向同级人民政府或t级土地管理部门加送以下附件:1.土地管理部门对建设用地的审查意见;2.建设用地征求意见书或有关部门证明材料;3.对建址在城市规划区内的项目,应附城市规划管理部门的审查意见;4.建设项征目拨用地呈报表;5.征〔拨)用地的补偿安置方案和征地费用包干协议,并附征地费用计算依据。需报国务院批准的建设用地,由省级人民政府行文上报。报告、文件按国务院规定份数报送;附件一式三份,其中报国务院一份,抄送国家土地管理局一份,建设项目的国家主管部门一份。建址在城市规划区内的项目,另抄送建设部一份。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条