说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 综合开发建设项目
1)  Comprehensive development and construction project
综合开发建设项目
1.
Comprehensive development and construction projects will have a significant impact on traffic demand.
本文首先对综合开发建设项目交通影响分析的研究对象和研究范围进行界定,并在此基础上深入分析了综合开发建设项目交通影响分析特点,剖析了交通影响分析的基本内容与方法。
2)  development project
开发建设项目
1.
It introduces the application of remote sensing technique to the working process and key steps of soil and water conservation monitoring of development projects by taking Hongjiadu Hydro-Power Station as an example.
以洪家渡水电站为例介绍了遥感技术在开发建设项目水土保持监测中应用的工作流程和关键步骤。
2.
Adopting the law of measure coefficient,soil and water loss amounts of plasticity geography during development project is calculated,the veracity of prediction of soil and water loss in the stage is increased greatly,the theoretic basis is offered for the working-out of soil and water conservation scheme of the construction project.
采用实测系数法,推算出开发建设项目施工期各类再塑地貌产生的水土流失量,大大提高了该阶段水土流失预测的准确性,为开发建设项目水土保持方案防治措施的制订,提供了可靠的理论依据。
3)  development and construction projects
开发建设项目
1.
Advances on soil loss monitoring techniques for development and construction projects in China;
我国开发建设项目水土流失监测技术进展
2.
Arrangement of soil and water conservation monitoring points of development and construction projects
开发建设项目水土保持监测点布局
3.
Usually the surface would be hardened in a large area after completion of development and construction projects.
开发建设项目建成后往往使地表大面积硬化,从而改变项目区入渗、蒸发、地表径流量和特性。
4)  development and construction project
开发建设项目
1.
Analysis of soil conservation monitoring method for Xinjiang development and construction projects
新疆开发建设项目水土保持监测方法浅析——以库玛拉克河吐木秀克水电站工程为例
2.
0×105 t/a bamboo-pulp paper production project in Chishui City, Guizhou Province, China for an example, soil and water conservation and ecological reconstruction of the development and construction project in the low mountain and hill region are discussed.
以位于贵州省赤水市的"黔北20万吨/年竹浆林纸一体化工程项目"为例,研究了低山丘陵区开发建设项目中的水土保持和生态建设问题。
3.
This paper discusses the demands for tasks and data of soil and water conservation monitoring in development and construction projects, puts forward an indicator system for soil and water loss monitoring, and designs an information system based on 3S techniques (remote sensing, geographic information system, and global positioning system).
在全面分析开发建设项目水土保持监测的业务和数据需求的基础上,提出了统一的监测指标体系,构建了基于3S技术的开发建设项目水土保持监测信息系统。
5)  construction project
开发建设项目
1.
Problems and suggestions about the botanic measure design of construction project;
开发建设项目水土保持植物措施设计的问题与建议
2.
The proposed construction project should not be approved or needed to revise if it not complies with the standards.
2008年7月1日起《开发建设项目水土流失防治标准》《开发建设项目水土保持技术规范》两部国家标准的正式实施,我国开发建设项目的选线选址、工程设计、施工组织、施工方式和工艺、工程管理等有了水土保持的限制性规定,不符合国家标准的建设项目将予以否决或修正。
3.
How to predict water erosion in construction projects is important for the control of new erosion.
开发建设项目中水蚀量的预测方法研究对于防治新的水土流失具有十分重要的意义。
6)  exploitation and construction project
开发建设项目
1.
For the exploitation and construction projects, soil and water loss is usually not thought to occur in winter because of ceased construction work, less stage disturbance, snowfall dominated precipitation, and seasonally disappeared runoff.
对开发建设项目来说,冬季由于施工停止,阶段扰动量小,降水以降雪为主,没有地表径流,往往认为不存在水土流失。
2.
A profound analysis to the purpose and significance of soil and water conservation monitoring in exploitation and construction projects is made at first.
开发建设项目水土保持监测是准确掌握建设项目水土流失动态变化和水土保持措施实施效果的重要手段与基础性工作。
补充资料:城市建设综合开发
      对准备开发建设的城市用地统一进行城市基础设施和生产建设项目以及生活服务设施的建设。各种设施和建设项目的建设相互配合、前后衔接,可使城市建设取得较好的综合效益。中国《城市规划条例》第43条规定:"城市成片建设的地区,应当按照城市规划,实行综合开发,统一建设。"
  
  综合开发的主要方式有两种:一种是"用地开发",即根据城市规划,由市政府统一征地,然后由综合开发企业组织招标发包,承包单位负责进行勘测、设计、平整土地、并修建道路、给水、排水、供电、供气、供热、通信等基础设施工程。开发建设后的用地交付使用单位并收取城市用地综合开发费。另一种是"建设开发",即在用地开发的基础上,进一步统一建设住宅、公共建筑、园林绿地,以至通用厂房和企事业单位内部的公用设施等。建成后成套出售或出租这些建筑物,并按土地面积和基础设施水平,向使用单位收取综合开发费。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条