说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 通过隧道
1)  passing through tunnel
通过隧道
1.
Research purposes:Taking erecting heavy-tonnage box girder with bridge girder erecting machine in Bidding Z8 section of Shijiazhuang-Taiyuan Railway Passenger Dedicated Line as an example,the analyses of the influencing factors on and necessity of erecting girder with bridge girder erecting machine while passing through tunnel are made.
研究目的:为了解决客运专线架桥机通过隧道架梁施工的技术难题。
2)  The truck cleared the tunnel.
卡车通过了隧道。
3)  access tunnel
通道;隧道
4)  sub-sea tunnel
过海隧道
1.
On the application of the brine freezing method in the rush emergency of the sub-sea tunnel
盐水冰冻法施工在过海隧道抢险中的应用
2.
Based on the design and construction experience of river-crossing tunnels,sub-sea tunnels,long tunnels and high-speed railway tunnels,the author concludes that the reasonable option for Taiwan Strait sub-sea tunnel is railway tunnel.
从国内外江、河、海底隧道的建设经验出发,根据长隧道及高速铁路隧道的设计、施工经验,论述了台湾海峡海底隧道采用铁路隧道方案的合理性;给出了台湾海峡海底隧道的断面形式、断面面积及洞门形式建议方案;提出了台湾海峡海底隧道选择施工方案要点;介绍了国内江河海底隧道的建设情况;重申审核工程修建好坏的理念,及修建过江、过海隧道比桥梁的优点;最后给出了修建海底水下隧道急需深入研究和解决的重大关键技术问题。
5)  River-crossing tunnel
过江隧道
1.
Study on building excavation for Pukou open-cut river-crossing tunnel of Nanjing
南京过江隧道浦口明挖段基坑降水方案研究
2.
One of the main reasons for the longitudinal deformation of river-crossing tunnels is riverbed scouring and siltation.
河床冲淤是引起过江隧道纵向变形的一个主要原因。
6)  transition tunnel
过渡隧道
补充资料:泊位通过能力


泊位通过能力


  泊位通过能力在单位时间内(年、月)一个泊位所能装卸船舶运载货物的最大数量。它是确定港口通过能力的基础,也是安排港口生产任务的主要技术依据。一般以吨为计量单位。泊位是供船舶停靠和作业的位置,分为码头泊位、浮筒泊位和锚地泊位,而常指码头泊位通过能力。其通过能力大小主要取决于它所能停靠的船舶吨位等级、船型和作业条件,装卸货物的类别,码头机械设备数量、技术性能及其对货物的适应程度,以及生产作业组织水平、船舶到港的均衡状况和实际可作业的时间等多种因素。泊位年、月通过能力的测算公式为:泊位年通过能力(吨)泊位月通过能力X12装卸工作月不平衡系数泊位月通过能力(吨)3。·〔2二-每昼夜泊位非生产作业时间(小时)船舶一次装.一,‘:*L。,十训J丫卜业目丁!司船舶一次作业的辅助及技术作业时间(小时)(小时)或泊位月泊位装卸通过能船舶效率力(吨)(船时量)又抨旦夜伸悴x 装训J件山二目丁J旬(小时)泊位月实际装卸天数
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条