说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 葛洲坝水电站
1)  Gezhouba Hydropower Station
葛洲坝水电站
1.
Alteration of Runner Seal of the Large Kaplan Turbine of Gezhouba Hydropower Station;
葛洲坝水电站水轮机转轮密封改造
2.
Research of Anti-abrasion of Turbine's Blades of Gezhouba Hydropower Station
葛洲坝水电站水轮机叶片抗磨蚀的研究与防护
3.
Effect on DC Biasing on Main Transformers of Gezhouba Hydropower Station and Study on Restraining Measures;
从与直流系统的联结情况、长江巨大水体的影响等方面分析了葛洲坝水电站主变压器受直流偏磁影响的可能性,并从磁路结构对三相五柱式变压器的抗偏磁能力进行了论证。
2)  Gezhouba hydropower station
葛洲坝电站
1.
The Summarize of Alteration and Capacity-Increasing in Gezhouba Hydropower Station;
葛洲坝电站机组增容改造综述
2.
The technical measures for capacity extension of 125 MW hydropower units of Gezhouba hydropower station are described.
介绍了葛洲坝电站125 MW水轮发电机组增容改造的技术措施。
3.
Model test indicated that in case the reverse regulation of Gezhouba Hydropower Station could be utilized,during TGP Hydropower Station regulating peak, all hydraulic indexes between two dams and downstream Gezhouba Project would satisfy the requirements for navigation.
水工模型试验研究表明 ,三峡电站汛期调峰时 ,运用葛洲坝电站进行反调节 ,两坝间和葛洲坝下游河段的水力指标可以满足航运要
3)  Gezhouba second Channel powerplant
葛洲坝二江电站
4)  Gezhouba Power Plant
葛洲坝水电厂
1.
high-voltage circuit breakers of 500 kV were equipped in the Gezhouba Power Plant.
葛洲坝水电厂共装有 18台 5 0 0kV高压断路器 ,鉴于目前SF6断路器液压机构存在的问题 ,为使设备安全运行 ,提出将FA4 - 5 5 0型断路器液压机构换型为LW6断路器的液压机构。
2.
The technical water supply system of Gezhouba Power Plant has been troubled by the blockage of water filter.
葛洲坝水电厂的技术供水系统一直承受着滤水器堵塞的困扰 ,滤水器的堵塞带来了运行设备的频繁倒换、阀门磨损、加压水泵损坏等一系列问题。
3.
The hydro-generating units of Gezhouba Power Plant have some problems such as the burning of thrust bearing liner, the block of large bearing sealing, the shed-off of anti-abrasion blocks of control ring, the easy shearing of shear lock, etc.
葛洲坝水电厂水轮发电机组存在着推力瓦烧损 ,大轴密封发卡 ,控制环抗磨块脱落 ,剪断锁易剪断等问题。
5)  Three Gorges-Gazhouba Cascade Hydroelectric Projects
三峡-葛洲坝梯级电站
6)  Gezhouba Reservoir
葛洲坝水库
1.
Simulation of operation for Three-Gorges cascade reservoir and its realization: to develop an optimal model with a certain volume of outflow from the Gezhouba Reservoir/;
三峡梯级水库调度仿真及实现——给定葛洲坝水库出库流量优化模型
补充资料:葛洲坝水电站
      中国最大的水电站(见图)。位于长江三峡出口、湖北省宜昌市境内。长江出三峡南津关后,江水被葛洲坝和西坝两岛分为三股,从右到左分别称为大江、二江和三江,葛洲坝水利枢纽建于此处。葛洲坝水电站设计装机容量为271.5万千瓦,单独运行保证输出功率为76.8万千瓦,平均年发电量141亿千瓦时,年平均利用约5190小时,1988年底全部建成并投入运行。
  
  葛洲坝水利枢纽主要由大坝、船闸、发电站、泄水闸、冲沙闸及挡水建筑物组成。大坝全长2595米,最大坝高47米,控制流域面积100万平方公里,总库容量15.8亿立方米。整个工程分两期,共开挖回填土石方1.113亿立方米,浇筑混凝土1113万立方米,安装金属结构7.61万吨。在三江和二江兴建3条船闸,在大江和二江兴建径流式电站各一座。一期工程包括二江的发电站、泄水闸和三江的二、三号船闸、冲沙闸及其他挡水建筑物。二江电站装有7台低水头转桨式水轮发电机组,一、二号机组容量为17万千瓦,水轮机转轮直径11.3米(见图),是中国最大的低水头水轮发电机组;其余5台机组容量为12.5万千瓦。三江二号船闸是世界上最大的船闸之一,闸室长280米,宽34米,槛上最小水深5米,一次可通过万吨级船队。一期工程于1970年12月30日开工,1981年1月3日大江开始截流,历时36小时23分胜利成功。6月21日三江船闸正式通航;7月31日二江电厂一号机17万千瓦机组并网发电。1981年 7月19日,葛洲坝经受了长江百年罕见的72000米3/秒特大洪水考验,大坝等工程设施运行使用正常。二期工程包括大江电站、一号船闸、大江冲沙闸和混凝土挡水坝等。电站设计装机14台,机组容量12.5万千瓦,到1986年底已安装5台机组并投入运行。1989年葛洲坝工程全部完成,水电站总装机容量为271.5万千瓦,是目前中国装机容量最大的电站。  葛洲坝水电站的电能通过500千伏和220千伏线路送入华中电力系统,还通过葛洲坝-上海±500千伏1080公里的直流输电线路送到上海。葛洲坝水电站是华中地区的主力电站,为该地区的经济建设和人民生活提供了强大的电力。葛洲坝水利枢纽工程还有效地改善了川江峡谷航道,给内河航运带来了效益。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条