说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 江口水电站
1)  Jiangkou Hydropower Station
江口水电站
1.
Calculation of elliptic double-curvature arch dam coordinates in Jiangkou hydropower station;
江口水电站椭圆双曲拱坝坐标计算
2.
Analysis of No1 rock body stability in left bank of Jiangkou hydropower station arch dam;
江口水电站拱坝左岸1号危岩体稳定分析
3.
Figure characteristic of ellipse double-curvature arch damin Jiangkou hydropower station;
江口水电站椭圆型双曲拱坝体形特点
2)  jiangkou hydroelectric station
江口水电站
1.
In order to simulate truly the underground water seeppage of Jiangkou Hydroelectric Station s dam area, the three dimensional seepage model was founded by 3 D FEM under the conditions of the features of terrane anisotropism and supplementary boundaries of rainfall infiltration.
针对江口水电站坝址区地质条件 ,在水平和垂直方向同时进行了渗透性分区 ;采用三维有限元法 ,并考虑了岩体各向异性的特点和降雨入渗补给边界 ,对坝址区渗流场进行了计算分析。
3)  Jiangkou water power station
江口水电站
1.
The geology and the topography are complex in dam site area of Jiangkou water power station.
江口水电站坝址区地质地形较为复杂,大小夹层分布众多。
2.
The dam in Jiangkou water power station is a double-curvature arch dam.
江口水电站大坝为混凝土双曲拱坝,坝址区的软弱夹层较多,并有溶洞发育,其中以K8溶洞规模最大。
4)  Bajiangkou Hydropower Station
巴江口水电站
1.
Application of Large Form with Light Cantilever in Bajiangkou Hydropower Station Project;
轻型悬臂大模板在巴江口水电站工程中的应用
2.
General Layout Design for Bajiangkou Hydropower Station in the Guijiang River of Guangxi
广西桂江巴江口水电站枢纽总体布置方案设计
5)  Shuangjiangkou Hydropower Station
双江口水电站
1.
Construction of Baiwan Tunnel of Shuangjiangkou Hydropower Station;
江口水电站白湾隧道施工
6)  Danjiangkou Hydropower Station
丹江口电站
1.
Since the first unit was put into operation in October 1968, Danjiangkou Hydropower Station has operated for tens years.
丹江口电站首台机组于1968年10月投产发电,经过数十年的运行,机组设备老化,部分机组已陆续改造。
补充资料:口水话
1.指废话。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条