说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 江垭水电站
1)  Jiangya hydropower station
江垭水电站
1.
Analysis on extraordinary sway and vibration of third turbogenerator set in Jiangya Hydropower Station;
江垭水电站3~#机组摆度振动超标原因浅析
2.
The prototype observation about the crest sluice gates and the mid-orifice sluice gates of Jiangya hydropower station is described.
用电测法对湖南江垭水电站溢流坝段中孔、表孔泄洪闸门进行了静、动力特性和局部开启单独及联合泄洪时的振动响应观测;评定了闸门安全性,并为江垭水电站制定闸门安全操作规程和竣工安全鉴定提供了技术资料。
2)  Jiangya hydroelectric station
江垭电站
3)  Qingjiang Shuibuya Hydroproject
清江水布垭水电站
4)  shuibuya hydropower station
水布垭电站
1.
The synchronizing point plan for shuibuya hydropower station to paralle in power system has been analysed comperhendively on technical and economic aspect,and the importance and rationalization of the synchronizing point plan was expounded.
对水布垭电站接入系统主要落点方案进行了较为深入的技术、经济综合分析,阐述了落点方案优化的重要性和合理性。
2.
A new 500 kV switch station will be build near shuibuya hydropower station after the cutover design of shuibuya hydropower have been censored .
水布垭电站接入系统设计(一次部分)通过审查后,在电站附近将新建500kV开关站。
3.
The successful experiences and inadequacies in implementation of resettlement work of Shuibuya Hydropower Station are summarized;the thinking and suggestions on strengthening the management of resettlement work are proposed.
总结了水布垭电站移民工作实施中的成功经验与不足之处,提出了加强移民工作管理的思考和建议。
5)  Shuibuya Hydropower Station
水布垭水电站
1.
Technology for installing base-ring and stay-ring of hydroturbine of Shuibuya Hydropower Station;
水布垭水电站水轮机基础环及座环安装
2.
On cracking treatment technique for facing concrete of concrete faced rockfill dam of Shuibuya Hydropower Station;
水布垭水电站混凝土面板堆石坝面板混凝土裂缝处理技术综述
3.
Key Points and Methods of Supervision Quality Control on Anti-scouring Wall Construction of Shuibuya Hydropower Station;
水布垭水电站防淘墙施工监理质量控制及方法
6)  Shuibuya Hydropower Project
水布垭水电站
1.
Design and Construction Methods of the Anti-scouring Wall for Shuibuya Hydropower Project;
水布垭水电站防淘墙设计与施工
2.
Downstream anti-scouring wall design for flood spillway of Shuibuya hydropower project;
水布垭水电站溢洪道下游消能防冲防淘墙设计
3.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
补充资料:新安江水电站
新安江水电站

    中国浙江省建德市境内新安江上的坝式水电站。中国第一座自己勘测、设计、施工和自制设备的大型水电站。以发电为主,兼有防洪、灌溉、养殖、旅游等效益。控制流域面积约1.05万平方千米。平均年径流量113亿立方米。基岩为砂岩和石英砂岩。混凝土宽缝重力坝最大坝高105米,坝顶长465米。总库容220亿立方米。溢流坝通过发电厂房顶泄流,最大泄量13200米3/秒。总装机容量66.25万千瓦,设计年发电量18.6亿千瓦时。1957年开工,1965年竣工。
   
   

新安江水电站

新安江水电站

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条