说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工企业定额
1)  construction enterprise quota
施工企业定额
1.
The construct market of the our country is continuously developing,so the function of construction enterprise quota in the construction item management develops increasingly.
随着我国工程建设市场的不断发展,施工企业定额在项目管理中的作用日益显现,通过对施工项目管理和施工企业定额的概念、具体活动、作用等各方面的分析,特别强调了施工企业定额在项目管理中的基础作用及编制方法,以促进施工企业定额的建设。
2)  Construction scale enterprises
企业施工定额
3)  enterprise quota
企业定额
1.
A brief talk on the importance of building the enterprise quota;
浅谈建立企业定额的重要性
2.
Discussion on enterprise quota under BOQ valuation mode;
工程量清单计价模式下企业定额的探讨
4)  enterprise norm
企业定额
1.
The building of carrying out the quantity list figure and enterprise norm;
实施工程量清单计价和企业定额的建立
2.
The importance of enterprise norm in list calling for tender mode;
清单招标模式下企业定额的重要性
3.
Exploration of enterprise norm making for catenary system improvement projects of existing electrified railway;
既有电气化铁路接触网改造工程企业定额编制探讨
5)  quota of enterprise
企业定额
1.
Organization and application of the quota of enterprises;
论企业定额的编制与应用
2.
The definition of internal quota of enterprise is introduced.
介绍了企业内部定额的定义,分析了企业定额的作用和意义,并对企业内部定额的编制原则及编制方法进行了阐述,建立企业价格信息系统的相关内容进行了论述,以保证企业定额符合实际,顺应建筑市场竞争形势。
3.
At the same time from some aspects the establishment of quota of enterprises is introduced in order to realize scientific and reasonable quotation for engineering construction project to increase the rate to win the bid.
重点介绍了工程量清单计价模式下企业如何合理报价的几点经验,供造价界同仁参考,并从几个方面对企业定额的建立进行了阐述,以便运用科学的预测方法,对建设工程做出准确、合理的报价,从而提高中标率。
6)  enterprise ration
企业定额
1.
This paper analyses the factors influencing construction cost, judges the design of methods, discusses to apply enterprise ration and market price information system into judging whether construction bid price below construction cost.
将企业定额、市场价格信息体系相结合应用于建筑工程评标中,以评判投标价格是否低于成本,并分析了影响建筑成本的因素及评判方法的设计,探讨了企业定额、市场价格信息体系相结合在实际招投标过程中的应用。
2.
It provided the compiling thought for compiling the enterprise ration that re-flected the enterprise technology and management level in the construction enterprises.
文章通过具体实例介绍了施工企业定额测算的过程和方法,为施工企业编制反应本企业技术与管理水平的企业定额提供了编制思路。
3.
This text introduced characteristic of the quoted price of the bill of quantities, according to these characteristics,we quote price using the front loaded method and basing on enterprise ration during the quoted price of the bill of quantities puts in practice the to increase the winning probability.
介绍了工程量清单报价的特点 ,并根据这些特点讲述了实施工程量清单报价以后的工程报价应根据企业定额并采用不平衡报价法等技巧进行 ,以提高中标的机率。
补充资料:施工企业材料储备定额


施工企业材料储备定额
quota of material reserve in construction enterprise

sh}gong qiye eailjao ehubei djnge施工企业材料储备定额(quota of materialreserve in eonstruetion enterPrise)为保证施工生产正常进行所规定的合理储存材料的数量标准。 施工企业材料储备定额,是编制材料计划、控制材料库存、决定仓储设施和核定储备资金的重要依据。它由经常储备定额、保险储备定额和季节储备定额组成。 (1)经常储备定额。在正常情况下,制定的合理储存材料的数童标准。其计算公式为: 经常储备量=平均日耗量x合理储备天数 (2)保险储备定额。施工生产所需用材料,考虑到出现意外情况,而影响供应所制定的储备。其计算公式为:保险储备量二平均日耗x保险储备天数 (3)季节性储备定额。某些材料资源,因受季节性生产影响,不能正常供应而制定的一种储备量。其计算公式为: 季节储备量二平均日耗量x季节天数 (刘和卿)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条