说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 结构震动
1)  structure quake
结构震动
2)  Structural response of motion
结构地震动反应
3)  aseismic structure
抗震结构
1.
Decision-making on optimal design of intensity for aseismic structures with three levels of fortification;
三级设防抗震结构最优设计烈度的决策
2.
A decision- making method for the optimal fortification level of aseismic structures considering the importance;
考虑重要性时抗震结构最优设防水准的决策方法
3.
Intelligent optimum design of aseismic structures based on genetic algorithms;
基于遗传算法的抗震结构智能优化设计
4)  seismic structure
结构抗震
5)  isolation structure
隔震结构
1.
Analyses of computational model and vibrating characteristics of the base isolation structure made of self-damped rubber laminated-support;
自阻尼叠层橡胶支座基础隔震结构的计算模型及振动特性分析
2.
Based on instantaneous-optima-algorithm semi-active control of isolation structure with MR damper;
基于瞬时最优算法的磁流变阻尼隔震结构半主动控制
3.
Semi-active control for MRD-isolation structure using MBC strategy;
应用MBC策略的MRD隔震结构半主动控制
6)  earthquake resistance of structure
结构抗震
补充资料:240震动机操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条