说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 联合预压
1)  Consociation Pre-press
联合预压
1.
The Vacuum-heap Carrying Consociation Pre-press Method to Reinforce the Saturated Soft Soil;
真空-堆载联合预压法加固软土地基
2)  combined heap load precompacting
联合堆载预压
1.
3 to Tongyi Quay at Xiamen Island,and the construction technology for treatment of the ground at intertidal zone by way of underwater vacuum precompacting and combined heap load precompacting.
介绍厦门岛第三码头至同益码头段岸线综合整治工程中的护岸工程基础软基处理过程,在潮间带采用水下真空预压联合堆载预压软基处理施工工艺。
3)  vacuum-surcharge preloading
真空-堆载联合预压
1.
The application of vacuum-surcharge preloading in foundation treatment for electric power plant;
真空-堆载联合预压法在电厂地基处理中的应用实例
2.
To prove its efficiency,a test on situ also conduced with vacuum-surcharge preloading saturated soil treatment.
真空-堆载联合预压处理深厚饱和软土地基时分层沉降测试现场实践表明,该监测技术精度较高而且较为稳定,具有较好的应用前景。
3.
Based on the field experiment and research work carried out in the Ri Zhao dock in Shan Dong province,the mechanism of improvement of soft subgrade with the vacuum-surcharge preloading method is discussed.
结合山东日照港集装箱码头辅建区的软基处理工程,开展了现场真空-堆载联合预压试验和监测资料分析研究,并对其加固机理和加固效果进行了探讨。
4)  combined vacuum and surcharge preloading
真空联合堆载预压
1.
Boundary effect of the method combined vacuum and surcharge preloading and influencing factors thereof;
真空联合堆载预压法的边界效应及其影响因素
2.
Assessment of effect of ground improvement for hydraulic structure using combined vacuum and surcharge preloading;
真空联合堆载预压法加固水工建筑物软基效果检验
5)  vacuum-heaped preloading
真空-覆水联合预压法
1.
The paper studies the consolidation mechanism and effect of vacuum-heaped preloading in a soft foundation treatment project and makes comparison with that of the vacuum preloading and heaped preloading.
文章结合某工程的软基处理的实践,研究了真空-覆水联合预压法加固机理和效果,并与真空预压法和堆载预压法进行了比较。
6)  vacuum combined with surcharge preloading
真空-堆载联合预压
1.
Simplified nonlinear analysis of subsoil improved by vacuum combined with surcharge preloading;
真空-堆载联合预压加固地基简化非线性分析
补充资料:预压法
      对软土地基预先加压,使大部分沉降在预压过程中完成,相应地提高了地基强度。预压法适用于淤泥质粘土、淤泥与人工冲填土等软弱地基。预压的方法有堆载预压和真空预压两种。
  
  堆载预压  在地基上堆放重物(水、土、砂、石等)进行预压。当堆载超过计划建造的建筑物荷载时,称为超载预压。为了防止堆载时压坏地基,需分级加载,即:在前一级荷载作用下地基基本固结后,再施加下一级荷载,直至达到设计荷载为止。
  
  预压所需时间的长短取决于地基土层的渗透特性、厚度和预压荷载的大小等因素。这些因素可以根据地基固结理论进行计算预计。施工时应监测地面沉降和土中孔隙水压力的消散情况,对预压加以控制。
  
  为了加速厚层软土的固结,缩短预压时间,应设法改善厚层软土的排水条件。最常用的排水的方法是在地基中按一定间距作孔,孔内填砂以形成砂井(图1)。然后在地面加铺砂垫层加以沟通。近年来,土工织物日益发展,已开始采用纤维编织的袋装砂井和在排水纸板上发展起来的塑料板排水。
  
  
  堆载预压早在50年代就广泛地应用于铁路、公路路堤、码头和岸坡的地基处理;还应用于土坝、水闸、房屋、冷藏库和油罐等工程的软基处理。如中国的苏北大浦和汉江杜家台两个大型水闸工程,经过预压后,大大减少了闸室和岸墩的沉降量;又如上海地区采用3万米3油罐充水预压改良地基,取得了显著效果。
  
  真空预压  以大气压作为预压荷载(图2),对地基土进行抽气,在土中造成一定的真空度,形成大气压力与真空压力的差值作用,将土中一部分水抽出,从而使地基土固结而加固。如果设置排水砂井,还可将孔隙内的水加速排出。
  
  
  此法首先由瑞典皇家地质学院于1952年提出。到80年代,中国也进行了室内外试验,并且已经开始在工程中应用。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条