1)  completion report
完工报告
2)  after construction
完工
1.
While after construction there are still plenty of dada that hasn t been delt with,thus the accounts can t be settled,which brings large lost for the enterprises.
然而在工程完工后,往往由于资料整理不及时或没有去整理或整理不规范,导致工程款得不到及时结算,从而无法支付,给施工企业造成了巨大的损失。
3)  mechanical complete
机械完工
4)  completion controls
完工控制
5)  Job Completion registration
完工登记
6)  completion probability
完工概率
1.
This paper focus on deploying resource,make use of the different completion probability of critical and un-critical path,the authors suggest a schedule optimization algorithm based on transferring resources from un-critical path to critical path purposely,and the result of applying the model shows that the method is practical for optimizing project schedule with resourc.
着眼于资源的调配,提出利用关键路线与非关键路线上完工概率的不同,有目的地将非关键路线上的资源调配到关键路线上进行进度计划优化的算法,并对该方法进行了算例说明,结果表明该法对资源约束下的工程项目进度计划优化具有实际意义。
参考词条
补充资料:发包人要求承包人按期按质完工并交付工程的权利
发包人要求承包人按期按质完工并交付工程的权利:根据我国《合同法》第281条的规定因施工人的原因致使建设工程质量不符合约定的标准,发包人有权要求施工工人在合理期限内无偿修理或者返工、改建。经过修理或者返工、改建后,造成预期交付的,施工人应承担违约责任。解释如下:承包人应当按照合同的约定期限完成工程建设,因可归责于承包人的原因显然不能按期完工会严重影响发包人使用,致使合同目的不能实现的,发包人应有权解除合同。但发包人解除合同时应当接受承包人的部分建设工程并支付相应的部分的价款或报酬。《合同法》第281条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。