说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 送变电工程
1)  transmission and distribution project
送变电工程
1.
Under the strategic political guidance for business of "keeping a foothold in Henan and opening up the international market, the company has undertook contracts for transmission and distribution projects in Kuwait, Bangladesh, Pakistan, Nigeria and so on and obtained good economical and social benefits.
该公司在“立足河南 ,面向全国 ,开拓国际市场”的经营战略方针指导下 ,先后在科威特、孟加拉、巴基斯坦、尼日利亚等国承包建设一批送变电工程 ,取得了良好的经济效益和社会效益。
2.
The transmission and distribution project as an important part of the Power Grid Project has an important significance to support the development of Power Grid Project.
送变电工程项目作为电网工程项目的一个重要环节,对电网工程项目的建设具有重要的意义,送变电工程施工安全风险评价有助于降低送变电工程的施工安全风险从而提高电网工程项目的经济效益。
2)  Changqing Transmission and Distribution Project
长庆送变电工程
3)  power transmission engineering
送电工程
1.
The application of project management in the progress management of power transmission engineering;
项目管理法在送电工程进度管理中的应用
2.
This paper presents three main methods in DEM acquisition for the power transmission engineering survey and design,namely data collection,vector generation and stereo matching of high-resolution satellite remote sensing imagery,giving the necessary precautions in the application of the methods above.
介绍了送电工程勘测设计中数字高程模型(DEM)获取的3种主要方法:收集资料获取、矢量化生成、高分辨率卫星遥感影像立体像对处理,及采用上述方式获取DEM的过程中应注意的问题。
4)  transmission and distribution construction
送变电施工
5)  West to East Power Transmission Project
西电东送工程
1.
Five-year development and new achievement of hydropower construction:Review of investigation and design for West to East Power Transmission Project;
五年大开发 水电谱新篇——贵州西电东送工程首批水电项目勘测设计工作回顾
2.
The West to East Power Transmission Project is an important part of the Western China Development Strategy.
西电东送工程是西部大开发的重要组成部分,通过开发西部地区丰富的水能资源和煤炭资源,将其资源优势转化为经济优势,对加快西部地区经济的发展、缩小东西部的差距、优化资源配置、实现东西部的“双赢”战略具有十分重要的意义。
3.
A series of measures and effective work in the administration management,technical management and project control obtained by Guiyang Hydropower Investigation Design & Research Institute,as well as the relevant scientific and technological(achievements) applied to the West to East Power Transmission Project are introduced herein.
主要介绍西电东送工程实施以来,贵阳勘测设计研究院为工程建设所采取的一系列措施,从工作管理、技术管理、项目管理等方面进行的卓有成效的工作,取得的系列科研成果,以及在西电东送工程中的应用。
6)  Three Gorges Power Supply Project
三峡送电工程
补充资料:送程六
【诗文】:
冬夜伤离在五溪,青鱼雪落脍橙荠。
武冈前路看斜月,片片舟中云向西。





【注释】:



【出处】:
全唐诗全唐诗:卷143_55
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条