说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 内铁芯
1)  inner cores
内铁芯
1.
Research on forming superimposition method of large tesla transformer inner cores;
大型特斯拉变压器内铁芯成型叠积方式的研究
2)  core type transformer
内铁芯变压器
3)  core type transformator
内铁芯变压器;铁芯式变压器
4)  core structure
铁芯结构;堆内构件
5)  iron core
铁芯
1.
The diagnosis and treatment of the fault in the transformer iron core grounding
变压器铁芯接地故障的诊断及处理
2.
Some shortcomings of the traditional coatings for iron core of electric steel are expounded.
阐述了电工钢传统涂层在固定铁芯方面存在的不足之处。
3.
5MVA furnace transformer iron core connecting with the ground is introduced.
5MVA电炉变压器铁芯接地故障的检查,并通过在现场采取有效的处理办法,解决了变压器运行中存在的局部过热现象,保障了变压器的安全稳定运行。
6)  core [英][kɔ:(r)]  [美][kɔr]
铁芯
1.
Diagnostic and Processing Method of Transformer Core with Grounding Fault in Multiple Spots;
变压器铁芯多点接地故障的诊断及其处理方法
2.
Study on Searching Method of Transformer Core Earth Fault;
变压器铁芯接地故障的查找方法
3.
Diagnosis and Treatment of Iron Core Multipoint Earth Fault of Lijiaxia Substation s 2~# Main Transformer;
李家峡变电所2~#主变铁芯多点接地故障诊断与处理
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条