说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 嵊泗人工鱼礁
1)  the artificial reef in Shengsi
嵊泗人工鱼礁
1.
A preliminary approach on the ecosystem model of the artificial reef in Shengsi;
嵊泗人工鱼礁海区生态系统能量流动模型初探
2)  artificial reef
人工鱼礁
1.
Advance in the research on artificial reef design;
人工鱼礁礁体设计的研究进展
2.
A review on influential factors of fouling organisms on artificial reef;
人工鱼礁附着生物影响因素研究进展
3.
Preliminary evaluation on effects of artificial reef project in Shengsi;
嵊泗人工鱼礁建设初期效果评价
3)  artificial reefs
人工鱼礁
1.
Evaluation on weight factors affecting artificial reefs site selection in Zhoushan area based on AHP;
舟山海域人工鱼礁选址基于AHP的权重因子评价
2.
Sitting and designing of artificial reefs;
人工鱼礁的投放区选址和礁体设计
3.
Validation and comparison between wind tunnel experiments and numerical simulation of flow field around artificial reefs
人工鱼礁流场风洞实验与数值模拟对比验证
4)  artificial fish reef
人工鱼礁
1.
According to the construction plan of artificial fish reef in Guangdong Coast,a water quality investigation before establishment of artificial fish reef was taken in Zhelin Bay near Raoping Sea in September 2007.
按照广东省人工鱼礁建设规划的要求,2007年9月对饶平柘林湾附近海域七星礁和虎屿2个拟建人工鱼礁区进行了海水水质调查分析。
5)  Shengsi
嵊泗
1.
Preliminary evaluation on effects of artificial reef project in Shengsi;
嵊泗人工鱼礁建设初期效果评价
6)  Shengsi HVDC project
嵊泗直流工程
1.
In this paper,the problems of stability of weak power system as DC sys te m urgently shutdown,disturbing the running pole caused by idle pole closing no l oad convertor transformer and erroneous firing of convertor valves,which occur red in commissioning of Shengsi HVDC project with weak receiving terminal,are an alyzed and discussed.
分析并讨论了弱受端嵊泗直流工程系统调试中出现直流急停机后弱网稳定性问题,停运极关合空载换流变压器对运行极干扰问题及换流阀误触发问题,介绍了现场解决方法,这对今后的国产直流工程具有重要参考价值。
补充资料:泗礁景区

泗礁景区包括泗礁本岛、大小黄龙岛、马迹山及其他附近诸岛。白节山、半边山两岛为景区之“飞”。本景区以连绵亘长的金沙为特色。仅泗礁就有大小优质沙滩14处之多,其中最著名的为基湖沙滩和南长涂沙滩。这两大沙滩,南北相背,倚山傍林,滩形优美,沙质细净,坦荡平缓,风和浪静,为国内少有的大型海浴、沙浴、日光浴场所和理想的海上运动场;其中基湖沙滩被誉为“南方北戴河”。大黄龙岛上多怪石和摩崖题刻,马迹山的海蚀虹桥,高达20余米,俨然是座“海上旋凯门”。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条