1)  Jinping Stage-Ⅰ Hydroelectric project
锦屏一级水电工程
2)  Jinping 1 Hydroelectric project
锦屏一级电站工程
3)  Jinping Ⅰ Hydropower Station
锦屏一级水电站
1.
Jinping Ⅰ Hydropower Station Dam Site Left Abutment High Slope Complicated Rock Mechanics Problems and Engineering Treatment Measures;
锦屏一级水电站坝区左岸高边坡复杂岩石力学问题及工程治理措施研究
2.
Jinping Ⅰ Hydropower Station Silicarenite Alkaline Activity Tests;
锦屏一级水电站石英砂岩碱活性试验研究
3.
Quarry Planning and Aggregate Processing System Design of Jinping Ⅰ Hydropower Station;
锦屏一级水电站料场规划及砂石加工系统方案设计
4)  Jinping first stage hydropower station
锦屏一级水电站
1.
Study on stability of Monkey slope of Jinping first stage hydropower station;
雅砻江锦屏一级水电站枢纽区猴子坡稳定性分析
2.
The deep fracture regularity of Pusiluogou left abutment slope at Jinping first stage hydropower station is comprehensively studied; and four deformation models of deep fracture are put forward; they are gentle shear and steep tension, gentle shear-tension belt, steep shear and gentle tension as well as tension respectively.
通过对锦屏一级水电站普斯罗沟坝址左岸深部裂缝的发育特点及规律的研究,提出了深部裂缝4种变形模式,即缓剪陡张型、缓倾张剪带型、顺剪反张型和引张型。
3.
At first,the slope geological conditions as well as dam site geostress and deep fractures in the left bank of Jinping first stage hydropower station have been investigated.
对锦屏一级水电站边坡工程地质条件、坝址区实测地应力分布及左岸深部裂缝发育规律进行全面分析,采用UDEC和3DEC离散元程序模拟锦屏一级水电站河谷的演化发展,对河谷边坡不同演化阶段应力场的变化规律及变形与卸荷分带规律进行深入分析。
5)  Jinping-Ⅰ Hydropower Station
锦屏一级水电站
1.
Seepage Calculation and Stability Analysis on Left Slope of Jinping-Ⅰ Hydropower Station;
锦屏一级水电站左岸边坡渗流计算及稳定性分析
2.
Design of river closure of Jinping-Ⅰ Hydropower Station;
锦屏一级水电站大江截流设计
6)  Jinping I hydropower station
锦屏一级水电站
1.
In this paper, the right spandrel groove high slope of Jinping I Hydropower Station in Sichuan province has been taken as an example.
本文以四川锦屏一级水电站右岸拱肩槽高边坡为研究对象,采用原型调研与室内分析相结合、机制分析与模拟研究相结合的思想,运用工程地质、数理统计、数值模拟等理论和方法,通过边坡开挖过程中揭露的变形破坏迹象研究、边坡监测数据分析以及边坡数值模拟分析等途径,对右岸拱肩槽边坡稳定性进行分析研究,取得了以下几个方面的研究成果:1。
2.
Jinping I hydropower station, which is 305m dam height,called highest arch dam in the world for the time being and 3,600 MW installed capacity, is planned to build on the middle-lower reaches of Yalong River between Yanyuan county and Muli county, Sichuan province.
锦屏一级水电站拟建坝高305m,装机容量3600MW,是拟建中的世界第一高拱坝。
3.
It has been successfully applied to the left bank of the Jinping I Hydropower Station for analyzing the safety monitoring data during construction period;it can be regarded as a basis for establishing the mass monitoring data management and analysis platform for the late construction and operation period of automatic monitoring.
系统已成功应用于锦屏一级水电站左岸高边坡工程施工期的安全监测分析,为工程施工后期及运行期自动化监测的海量监测数据管理和分析平台的建立奠定了基础。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条