说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 逆时序施工法
1)  back sequence construction
逆时序施工法
1.
By analyzing benefit and shortcoming of the mechanism of draining consolidation way under vacuum preloading and surcharge, back sequence construction is proposed and the idea can ultimately advance economic value after meeting the essential sedimentation of the construction and the finished construction.
从分析堆载和真空预压等排水固结施工法的机理与优缺点入手,提出了逆时序施工法,以求能在满足施工工期与工后沉降等基本要求的前提下最大限度地提高经济效益。
2)  inverted engineering
逆序施工
3)  excavation and support sequence
施工时序
1.
Based on centrifuge model tests and numerical calculation,the deformation failure and stress field due to different excavation and support sequences,are analyzed.
不同施工时序对边坡稳定性有较大影响,应用离心模型试验和数值计算研究和分析不同施工时序对边坡变形破坏和应力场的影响。
4)  reverse construction
逆作法施工
1.
Through construction Practice of reverse construction of underground structure, This article describes the technology of foundation pit supporting , earthwork,formwork,steel bars and concrete works and monitoring in the construction,Control measures of cracks of concrete and quality control measures of stability of pit are also be described.
通过地下结构的逆作法施工实践,对施工中基坑支撑、土方开挖、模板、钢筋、混凝土工程等的施工监测技术,以及地下室逆施中混凝土裂缝控制、基坑安全的各项质量保证措施进行了介绍。
5)  construction of top-down invert method
逆筑法施工
6)  top-down construction
逆作法施工
1.
the paper introduces the top-down construction principles,its classification,technique direction and construction method.
针对高层建筑日益增多的趋势,为了安全施工和环境效益,介绍了逆作法施工的原理、分类、工艺特点以及逆作法施工方案。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条