说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 建设过程后评价
1)  construction process post-evaluation
建设过程后评价
2)  process post-evaluation
过程后评价
1.
With post project evaluation in china has become an important tool of improving investment performance and enhancing decision-making, people will pay more attention to the importance of process post-evaluation.
随着项目后评价在我国对改进投资效益、提高决策方法等方面起到了重要的作用,项目过程后评价的重要性也随之得到了重视。
3)  preference decision tables
建设项目过程评价
4)  post-evaluation of highway construction project
建设项目后评价
5)  process modeling evaluation
过程建模评价
6)  economic re evaluation of construction project
建设项目经济后评价
1.
As a scientific method and institution,the economic re evaluation of construction project has become an essential step in project management in many countries and international institutions.
从确保前评价和可行性研究的客观公证性、减少和避免决策失误的角度出发 ,以系统论和反馈控制原理为基础 ,对建设项目经济后评价及其指标体系的建立进行了探讨 ,作为提高建设项目决策水平的理论参
补充资料:城镇建设用地评价


城镇建设用地评价
land evaluation for urban infrastructure

  ehengzhen iianshe yongdi Pingiia城镇建设用地评价(land evaluation forurbanin-6习structure)根据城镇规划和建设的要求以及工程技术的可能性和经济合理性,对城镇规划区范围内的土地进行建设用地适宜性评定的过程。城镇建设用地评价是城市总体规划布局中的基础性工作,为合理选择和组织城镇建设用地提供科学依据。评价工作的主要内容包括:①调查、搜集和分析研究城镇规划区内各自然要素;②选择影响建设工程要求的要素或要素组合作为城镇建设用地的评价指标,确定划分指标等级的标准;③根据评价等级标准把城镇规划区内的土地归人相应等级并绘制城镇建设用地评价图或城镇建设适用性土地等级图。评价指标通常有地基承载力、地下水位埋深、坡度、洪水淹没度、地表切割状况(有无冲沟)以及其他有关的工程地质和地貌现象。根据土地对城镇建设的适用性,通常把城镇建设用地分为三等,等内可再续分出级。一等地,指适用于城镇建设的土地。通常要求:地基承载力大于1.5千克/平方厘米;地下水位埋深大于2.0米(一级)或1.5~2.0米(二级);坡度小于10%(一级)或10%~巧%(二级);在百年洪水位之上;地表无冲沟(一级)或有停止活动的冲沟(二级)。二等地,指采取一定工程准备措施加以改善才适用于城镇建设的土地。通常指地基承载力为1.0~1.5千克/平方厘米;地下水位埋深1.0~ 1.5米(一级)或小于1.0米(二级);坡度小于巧%(一级)或巧%~20%(二级);在百年洪水位以上(一级)或有些年分受洪水淹没(二级);地表无冲沟〔一级)或有活动性不大的即沟又一欲/。二等她.指不适用于城镇建设的土地。(陈百明)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条