1)  Jinping first-level
锦屏一级
2)  Jinping Ⅰ Hydropower Station
锦屏一级水电站
1.
Jinping Ⅰ Hydropower Station Dam Site Left Abutment High Slope Complicated Rock Mechanics Problems and Engineering Treatment Measures;
锦屏一级水电站坝区左岸高边坡复杂岩石力学问题及工程治理措施研究
2.
Jinping Ⅰ Hydropower Station Silicarenite Alkaline Activity Tests;
锦屏一级水电站石英砂岩碱活性试验研究
3.
Quarry Planning and Aggregate Processing System Design of Jinping Ⅰ Hydropower Station;
锦屏一级水电站料场规划及砂石加工系统方案设计
3)  Jingpin I Hydropower Plant
锦屏一级电站
4)  Jinping first stage hydropower station
锦屏一级水电站
1.
Study on stability of Monkey slope of Jinping first stage hydropower station;
雅砻江锦屏一级水电站枢纽区猴子坡稳定性分析
2.
The deep fracture regularity of Pusiluogou left abutment slope at Jinping first stage hydropower station is comprehensively studied; and four deformation models of deep fracture are put forward; they are gentle shear and steep tension, gentle shear-tension belt, steep shear and gentle tension as well as tension respectively.
通过对锦屏一级水电站普斯罗沟坝址左岸深部裂缝的发育特点及规律的研究,提出了深部裂缝4种变形模式,即缓剪陡张型、缓倾张剪带型、顺剪反张型和引张型。
3.
At first,the slope geological conditions as well as dam site geostress and deep fractures in the left bank of Jinping first stage hydropower station have been investigated.
锦屏一级水电站边坡工程地质条件、坝址区实测地应力分布及左岸深部裂缝发育规律进行全面分析,采用UDEC和3DEC离散元程序模拟锦屏一级水电站河谷的演化发展,对河谷边坡不同演化阶段应力场的变化规律及变形与卸荷分带规律进行深入分析。
5)  Jinping-Ⅰ Hydropower Station
锦屏一级水电站
1.
Seepage Calculation and Stability Analysis on Left Slope of Jinping-Ⅰ Hydropower Station;
锦屏一级水电站左岸边坡渗流计算及稳定性分析
2.
Design of river closure of Jinping-Ⅰ Hydropower Station;
锦屏一级水电站大江截流设计
6)  Jinpin Ⅰ Arch Dam
锦屏一级拱坝
参考词条
补充资料:济南锦屏山

锦屏山位于明水南18公里处,距济南东南55公里。海拔563.5米,方圆12公里。山上峰峦滴翠,古树翠柏遮天蔽日。“碧霞元君祠”、“文昌阁”等景点已于近期修缮一新。

每年农历3月15日—20日举办庙会,去锦屏山可在解放桥或甸柳庄乘坐到章丘文祖汽车。

龙泉井:位于东坡景区,井深5米,井旁的山崖上有一石刻,上书“龙泉井”,旁有“井泉龙王”石庙。

龙泉井:位于东坡景区,井深5米,井旁的山崖上有一石刻,上书“龙泉井”,旁有“井泉龙王”石庙。

碑林:东坡山顶象鼻峰下有三十多块石碑,多为重修碑、功德碑,还有护山护林的训令和记载当时锦屏山乞神求福盛况的石碑。

迎仙门:东路山谷底部两壁陡峭如削,有形似山门的景石,上书“迎仙门”。

锦屏山古迹甚多,置身其中,如入仙境,实属度假休闲游玩爬山的好去处。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。