说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 短期计划
1)  short-term plan
短期计划
2)  short-term scheduling
短期生产计划
1.
A new method for short-term scheduling for crude oil operations in refinery;
一种新的炼油厂原油处理短期生产计划方法
2.
The integrated algorithm can connect crude oil blending linear model,order-oriented short-term scheduling model,nonlinear blending model of products oil and inventory management model together.
结合上海某炼油厂的实际生产情况,引入油品非线性调合模型,提出了集成控制原油线性调合、基于订单的短期生产计划、成品油非线性调合及库存管理的算法。
3)  short-term stripping plan
短期采剥计划
1.
Development of surface mine short-term stripping plan CAD system;
露天矿短期采剥计划CAD系统的开发
4)  short-term generation scheduling
短期发电计划
1.
Improved PSO algorithm and its application in short-term generation scheduling;
基于改进PSO算法的短期发电计划研究
2.
A general model based on linear programming for short-term generation scheduling of cascade hydroelectric systems is proposed.
建立了基于线性规划的梯级水电系统短期发电计划通用模型。
5)  SHYS-Short-Term Hydro Scheduling
SHYS-短期水电计划
6)  short-term training program
短期训练计划
补充资料:短期计划

duanqi jihua
短期计划
short-term plan

对较短时期内的经济、社会活动进行有目标的事先协调与控制的形式。通常是指为期一年的年度计划。以一年为计划时限,与农业生产周期和国家财政预算期是一致的,也符合人们按日历年度组织管理经济、社会活动的习惯。
在社会主义国家,短期计划具体贯彻实现中期计划的各项要求,是中期计划与现行活动之间的纽带。在中期计划分列年度指标的情况下,年度计划的制订则比较简单易行。但是,制订中期计划时,总有一些难以预见的因素,如农业生产的丰歉及对使用农业原料部门的影响,国外市场的波动,重大建设项目投产时间提前或推后,等等。因此,必然要求通过年度计划,根据当年以及未来一、二年的情况作出全面分析和预测,对社会需要和社会资源进行详细的核算平衡,并在上下年度之间,地区、部门、企业之间,以及与全国计划之间协调、衔接。这样,可以尽量减少或避免对中期计划原订分年指标进行频繁的调整,以加强计划的稳定性和严肃性。
社会主义国家年度计划规定的计划任务和有关技术经济指标、内容,比中期计划更为具体、细致、准确,特别是要明确规定工农业主要产品和产量,固定资产投资额,在建工程项目投入使用的具体期限,劳动生产率,工资基金和主要经济效益指标。安排计划时,重点在于当年消费品供应与社会购买力的平衡,生产资料的供求平衡,财政、信贷、物资、外汇的平衡和劳动力平衡。此外,对国家采取的经济政策、技术措施和计划管理形式、方法的调整,也要作出相应的规定。
季度、月度计划或更短时限的计划,也属于短期计划,主要在部门、公司和基层企业编制。
(吴微)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条