2) Construction scheme
施工方案
1.
Construction scheme for Xujiahui hub of Shanghai rail transit;
上海轨道交通徐家汇枢纽施工方案研究
2.
Transitional construction scheme of communication equipments in the running railway line;
营业线通信设备过渡施工方案
3.
On the secondary lining construction scheme of tunnel;
隧道二次衬砌施工方案的探讨
3) construction project
施工方案
1.
Application of grey system in decision-making on construction project of moulding board of shearing force wall;
灰色系统在剪力墙模板施工方案决策中的应用
2.
Fuzzy Opitimize Model of Multi-goal Decision-making in Construction Project;
施工方案的多目标决策模糊优化模型
3.
Decision-Making of construction project is a large system which consists of multiple target,complex structure and numerous factors.
大型工程施工方案的评价决策是一个多目标、结构复杂、因素众多的大系统。
4) construction plan
施工方案
1.
The application of analysis method for technical economic in priority election of construction plan;
技术经济分析方法在施工方案优选中的应用
2.
Lifting construction plan of deck steel tubular arch of Jingyanghe Bridge;
景阳河大桥上承式钢管拱的吊装施工方案
3.
The choice of construction plan in metallurgical project preparation;
冶金工程施工组织设计中施工方案的选择
5) construction schemes
施工方案
1.
The relations between construction organization design construction schemes and technical intentions;
施工组织设计和施工方案及技术交底的关系
2.
The Construction Schemes and Controlling Technology of Wenzhouliao Bridge (a Continuous Rigid-frame Bridge) of Qingjingqing Highway in Zhejiang Province;
浙江省庆景青公路温州寮大桥(连续刚构桥)施工方案及控制技术
3.
The construction schemes and blast parameters were presented in detail.
在此基础上,将顶部卸压法实施于井下,详细介绍了其施工方案与爆破参数。
6) construction program
施工方案
1.
The 32 m cast-in-place box beam span railway construction program of high-speed railway;
高速铁路32m现浇箱梁跨铁路施工方案
2.
Study on construction program of renovation against damaged trackbed of tunnel;
隧道出口段道床病害整治施工方案研究
3.
Technically efficient and economically proper construction program is chosen by technical economic comparison of two construction programs of 1m-16m hollow plate girder.
通过对1m~16m空心板梁两种施工方案的技术经济比较,选定技术可行、经济合理的施工方案。
补充资料:施工导流
施工导流 construction diversion 在水域内修建水利工程的过程中,为创造干地施工条件,用围堰围护基坑,将河水通过预定方式导向下游的工程措施。导流方案的选定关系到整个工程施工的工期、质量、造价和安全度汛,事先要有周密设计,施工要像对待主体工程那样重视。导流方式分河床外导流与河床内导流。前者用围堰一次拦断整个河床,河水通过河床外的导流泄水建筑物导向下游;后者用围堰先后分段围护部分河床,河水通过被束窄的另一部分河床导走,即分期导流。按泄水建筑物类型分,有明渠导流、涵洞或隧洞导流,以及坝体底孔、梳齿或缺口过流等导流方式。涵洞导流多用于中小型水闸、土石坝等工程,底孔导流用于混凝土坝施工。梳齿导流则是在混凝土坝施工时预留梳齿状缺口过水,随坝体升高,分级轮换封堵缺口。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条