说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 责任成本测算
1)  responsibility cost estimation
责任成本测算
1.
First it discusses responsibility cost management institution,summarizes responsibility cost estimation,responsibility cost control, responsibility cost check and other responsibility cost management content.
首先对责任成本管理体制进行了论述,然后就责任成本测算、责任成本控制、责任成本核算等责任成本管理内容作出总结,实践证明,责任成本管理是控制项目成本、保证项目质量的有效举措。
2)  responsibility for cost estimates
责任成本预算
3)  responsibility cost check
责任成本核算
1.
First it discusses responsibility cost management institution,summarizes responsibility cost estimation,responsibility cost control, responsibility cost check and other responsibility cost management content.
首先对责任成本管理体制进行了论述,然后就责任成本测算、责任成本控制、责任成本核算等责任成本管理内容作出总结,实践证明,责任成本管理是控制项目成本、保证项目质量的有效举措。
4)  responsibility cost
责任成本
1.
Carrying out responsibility cost management in construction enterprises;
施工企业实行责任成本管理的探讨
2.
On responsibility cost management in engineering project;
浅谈工程项目责任成本管理
3.
Analysis and development of responsibility cost budge software;
责任成本预算软件的分析与开发
5)  liability cost
责任成本
1.
Elementary introduction to application of liability cost management in limestone mining;
浅谈责任成本管理在石灰石开采业的应用
2.
A three dimensional cost calculation model has therefore been established for administration of mobile cost and liability cost thereby providing the required management and administration information under the market economy conditions and improving the management .
为此,以制造成本法为基础,借鉴变动成本法和责任成本管理的思想理论,提出建立三元成本计算的新模式,旨在使企业更好地提供满足市场经济条件下经营决策所需要的信息,提高企业管理水平,努力降低企业产品成本。
3.
<Abstrcat> In this paper, the author argues that the management of liability cost is an important way to enhance university logistic management.
认为实行责任成本管理是提高高校后勤管理绩效的重要途径。
6)  responsible cost
责任成本
1.
It points out that when construction enterprises make project responsible cost as the accordance of cost control,project construction cost management can fit in with the regulation of market economy.
从项目成本预算、中间检查分析、事后工程成本考核与奖罚三方面探讨了如何进行项目法施工中的工程成本管理,指出施工企业只有将项目责任成本作为成本控制的依据,才能使项目施工成本管理符合市场经济的客观规律。
2.
On the premise of carrying out responsible cost, it is an effective method for a business to bring about cost control of hierarchal multilevel to restrain the rapid of product cost.
在企业实行责任成本制进而实现成本分级递阶控制是遏制产品成本飙升的有效方法 。
补充资料:成本租金


成本租金


【成本租金】回收的租金只能弥补建房及经营成本。目前,成本租金计算不包括投资利息及经营利润,它一般只包括折旧费、维修费、管理费三项。实际上,成本租金除上述三项外,还应包括利息和税金。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条